濟(jì)南機(jī)箱機(jī)柜:高低壓成套柜二次接線工藝規(guī)范

發(fā)布時(shí)間:2025-10-22 來源:http://bjfrp.com/ 瀏覽量:

  1、工藝流程準(zhǔn)備相關(guān)圖紙、規(guī)范書(領(lǐng)料單)及工藝文件→領(lǐng)取所需的電器元件及各種規(guī)格導(dǎo)線和輔助材料→熟悉圖紙并核對元器件的位置和規(guī)格→標(biāo)識元器件的符號牌-構(gòu)思線束的走向及幾個(gè)關(guān)鍵的分支及交匯點(diǎn)的處理方法→下線配線→接線→整理線束→質(zhì)量自檢和清理機(jī)柜→報(bào)檢

  1. Preparation of relevant drawings, specifications (material requisition) and process documents for the process flow → Collection of required electrical components, various specifications of wires and auxiliary materials → Familiarity with the drawings and verification of the position and specifications of the components → Identification of symbol plates for the components - Concept of the direction of the wiring harness and the handling methods for several key branches and intersections → Offline wiring → Wiring → Sorting of wiring harnesses → Quality self inspection and cleaning of the cabinet → Inspection reportbase64_image

  2、技術(shù)要求2.1.嚴(yán)格依照二次圖紙要求、按工藝文件要求、按技術(shù)標(biāo)準(zhǔn)要求制做,接線要準(zhǔn)確,途徑要簡捷,布局合理、橫平豎直、美觀大方、牢固清晰。2.2.選用的二次導(dǎo)線應(yīng)采用電壓不低于500V銅芯塑料絕緣導(dǎo)線(BV、BVR)其截面要求電流回路采用2.5mm2,電壓回路采用1.5mm2,其顏色一般為黑色,接地采用黃綠雙色導(dǎo)線,截面不小于2.5mm2,電子器件小電流、低電平允許采用小于1.5mm2,但不得小于0.75mm2。計(jì)量回路當(dāng)電力和設(shè)計(jì)部門有特殊要求時(shí),電流回路為4mm2、電壓回路為2.5mm2、零線為2.5mm2,且顏色分別為:A相黃色、B相綠色、C相紅色,零線為藍(lán)色配置。2.3.二次回路的線束布置一定要有規(guī)律,原則上應(yīng)以活動(dòng)門鉸鏈側(cè)由上而下,布置做到合理、牢固、,分流的線束應(yīng)做到橫平豎直、層次分明、整齊美觀,除必要彎曲(如轉(zhuǎn)換方向)外,不能有彎斜、扭曲的現(xiàn)象。捆扎方式要規(guī)范、牢固可靠、均勻。2.4.所有的門應(yīng)有可靠牢固的接地裝置(接地柱),應(yīng)與柜體柜架構(gòu)成一個(gè)良好、接地體系。裝置采用螺栓不能小于6mm,且接地點(diǎn)上應(yīng)平整、光滑、無漆漬、無銹痕,連接的導(dǎo)線不能小于2.5mm2(建議采用不小于4mm2裸銅軟線)的黃綠雙色軟線。2.5.二次回路的線束不準(zhǔn)在導(dǎo)電部件敷設(shè),高壓柜線束與導(dǎo)電部位的凈距離3kV不小于75mm,6kV不小于100mm,10kV不小于125mm,35kV不小于300mm。導(dǎo)線線部裸露部位之間及裸露部位與金屬框架的電氣間隙應(yīng)不小于4mm,爬電距離應(yīng)不小于6mm2.6.電器元件上接點(diǎn)一般只連接一根導(dǎo)線,必要時(shí)允許連接二根,其工藝要求應(yīng)符合以下要求,所有接點(diǎn)與導(dǎo)線連接時(shí)應(yīng)有防松措施,擰緊后應(yīng)有2~5扣螺紋,所有的緊固件(螺絲、墊圈、螺母)均應(yīng)為鍍鋅件。導(dǎo)線中間不允許有接頭。2.7.電流回路的連接應(yīng)通過端子連接,且端子應(yīng)為試驗(yàn)型接觸良好的端子,同時(shí)電流回路應(yīng)有可靠的接地,方式應(yīng)符合相關(guān)要求。所有端子間的連接應(yīng)采用專用連接片連接。2.8.為了保證接點(diǎn)的可靠,所有導(dǎo)線(除單根導(dǎo)線需做羊眼圈外)應(yīng)有冷壓接頭(冷壓線鼻),冷壓接點(diǎn)選用的規(guī)格與制作應(yīng)符合其工藝要求。a)預(yù)絕緣端頭與導(dǎo)線的冷壓接后尺寸見圖a。b)管形預(yù)絕緣端頭與導(dǎo)線的冷壓后尺寸見圖b。c)裸端頭與導(dǎo)線的冷壓接后尺寸見圖c。d)觸針式端頭與導(dǎo)線冷壓接后的尺寸見圖d。2.9.為了嚴(yán)肅二次圖紙與實(shí)物的一致性,便于有關(guān)部門驗(yàn)證及維護(hù)的方便,所有導(dǎo)線端頭與元器件應(yīng)有明顯正確的標(biāo)志,即導(dǎo)線的標(biāo)記套、元器件符號牌。導(dǎo)線標(biāo)記套的規(guī)格應(yīng)與導(dǎo)線線徑匹配,接線后的方向應(yīng)與圖紙一致,元器件的符號牌粘貼位置應(yīng)醒目、正確、美觀,便于觀看與核對。

  2. Technical requirement 2.1. Strictly follow the requirements of the secondary drawings, process documents, and technical standards for manufacturing. The wiring should be accurate, the route should be simple, the layout should be reasonable, horizontal and vertical, beautiful and elegant, and firm and clear. 2.2. The selected secondary wire should be a copper core plastic insulated wire (BV, BVR) with a voltage of not less than 500V. The cross-sectional area of the current circuit should be 2.5mm2, and the voltage circuit should be 1.5mm2, generally black in color. The safety grounding should use a yellow green dual color wire with a cross-sectional area of not less than 2.5mm2. For small current and low level electronic devices, it is allowed to use a cross-sectional area of less than 1.5mm2, but not less than 0.75mm2. When there are special requirements from the power and design departments for the metering circuit, the current circuit is 4mm2, the voltage circuit is 2.5mm2, and the neutral wire is 2.5mm2, and the colors are: yellow for phase A, green for phase B, red for phase C, and blue for the neutral wire configuration. 2.3. The wiring harness layout of the secondary circuit must be regular. In principle, it should be arranged from top to bottom on the hinge side of the movable door, and the layout should be reasonable, firm, and safe. The diverted wiring harness should be horizontal and vertical, with clear layers, neat and beautiful. Except for necessary bending (such as changing direction), there should be no tilting or twisting phenomenon. The bundling method should be standardized, firm, reliable, and even. 2.4. All doors should have reliable and secure grounding devices (grounding columns), which should form a good and safe grounding system with the cabinet frame. The device should use bolts with a diameter of no less than 6mm, and the grounding point should be flat, smooth, without paint stains or rust marks. The connected wires should not be less than 2.5mm2 (it is recommended to use bare copper flexible wires with a diameter of no less than 4mm2) with yellow green dual color flexible wires. 2.5. The wiring harness of the secondary circuit is not allowed to be laid on conductive parts. The net distance between the high-voltage cabinet wiring harness and conductive parts should be no less than 75mm for 3kV, no less than 100mm for 6kV, no less than 125mm for 10kV, and no less than 300mm for 35kV. The electrical gap between the exposed parts of the wire and the metal frame should not be less than 4mm, and the creepage distance should not be less than 6mm2.6. Generally, only one wire is connected to the contact on the electrical component, and if necessary, two wires are allowed to be connected. The process requirements should meet the following requirements. All contacts should have anti loosening measures when connected to the wire, and after tightening, there should be 2-5 threads. All fasteners (screws, washers, nuts) should be galvanized. No joints are allowed in the middle of the wire. 2.7. The connection of the current circuit should be made through terminals, and the terminals should be of the test type with good contact. At the same time, the current circuit should have a reliable grounding method that meets relevant requirements. All connections between terminals should be made using dedicated connectors. 2.8. In order to ensure the safety and reliability of the contacts, all wires (except for single wires that require sheep eye circles) should have cold pressed joints (cold pressed wire noses), and the specifications and production of cold pressed contacts should meet their process requirements. a) The dimensions of the pre insulated end and the wire after cold crimping are shown in Figure a. b) The dimensions of the tubular pre insulated end and the wire after cold crimping are shown in Figure b. c) The dimensions of the bare end and the wire after cold crimping are shown in Figure c. d) The dimensions of the contact pin end and the wire after cold crimping are shown in Figure d. 2.9. In order to ensure the consistency between the secondary drawing paper and the actual product, and for the convenience of verification and maintenance by relevant departments, all wire ends and components should have clear and correct markings, namely wire marking sleeves and component symbol plates. The specifications of the wire marking sleeve should match the wire diameter, and the direction after wiring should be consistent with the drawing. The symbol plate of the component should be pasted in a prominent, correct, and beautiful position for easy viewing and verification.

  3、配線的準(zhǔn)備工作3.1.領(lǐng)取圖紙,技術(shù)規(guī)范資料(規(guī)范書),并將其消化和策劃。3.2.按圖紙領(lǐng)取元器件及各種規(guī)格導(dǎo)線和輔助材料。3.3.準(zhǔn)備好必需的輔助材料如梅花螺絲刀,吸盤,壓線鉗,鋼板尺,BVR銅線,扎帶,冷壓端頭,斜口等。4.4.然后按照盤面布置圖安裝元器件如指示燈和轉(zhuǎn)換開關(guān)等,并且在各個(gè)元器件下粘貼標(biāo)簽(標(biāo)簽長度為15mm,字體為4:3)標(biāo)簽應(yīng)貼在同一條直線上如圖所示。3.5.然后用工具(工具的寬度為13mm)畫線如圖A所示,對于單排貼吸盤的指示燈粘貼吸盤時(shí)距離應(yīng)大于工具的寬度大約20-22mm。3.6.確定所畫線平直后進(jìn)行粘貼吸盤如圖B3.7.根據(jù)導(dǎo)線規(guī)格選擇號碼套管,并按圖紙及配線的先后次序打印標(biāo)記套(回路標(biāo)號),標(biāo)記套(回路標(biāo)號)應(yīng)清楚、牢固、完整不脫色,編寫元件符號牌要求字跡清晰端正,不得涂改、不褪色。3.8.按圖紙與規(guī)范書的要求領(lǐng)取并核對元器件型號規(guī)格和安裝位置。3.9.所有接入電器元件的導(dǎo)線端頭均應(yīng)套入號碼管(標(biāo)記套),除電器元件本身連線外,號碼管套入導(dǎo)線后的閱示方向原則:站在產(chǎn)品正前方水平方向從左到右的讀入方向;垂直方向從下到上的讀入方向;若為屏后走線時(shí),站在屏后觀看與屏前相同,號碼管原則上應(yīng)先套入回路號,然后套入對標(biāo)記套,導(dǎo)線兩端頭的標(biāo)記套應(yīng)與二次圖相符,方向一律按下圖所示方向:

  3. Preparation work for wiring 3.1. Obtain drawings, technical specification documents (specification books), and digest and plan them. 3.2. Obtain components, various specifications of wires, and auxiliary materials according to the drawings. 3.3. Prepare necessary auxiliary materials such as a Phillips screwdriver, suction cup, crimping tool, steel ruler, BVR copper wire, zip ties, cold pressed end caps, slanted mouth, etc. 4.4. Then install components such as indicator lights and conversion switches according to the panel layout diagram, and paste labels (label length of 15mm, font of 4:3) under each component. The labels should be pasted on the same straight line as shown in the figure. 3.5. Then use a tool (with a width of 13mm) to draw a line as shown in Figure A. For the indicator light with a single row of suction cups, the distance between the suction cups should be about 20-22mm greater than the width of the tool. 3.6. After confirming that the drawn line is straight, paste the suction cups as shown in Figure B3.7. Select the number sleeve according to the wire specifications, and print the marking sleeve (circuit number) in the order of the drawing and wiring. The marking sleeve (circuit number) should be clear, firm, and complete without fading. The writing of the component symbol plate requires clear and upright handwriting, and should not be altered or faded. 3.8. Obtain and verify the component model, specifications, and installation position according to the requirements of the drawings and specifications. 3.9. All wire ends connected to electrical components should be inserted into a marking sleeve. Except for the wiring of the electrical components themselves, the reading direction of the marking sleeve after inserting the wire should follow the principle of standing in front of the product in a horizontal direction from left to right; Vertical reading direction from bottom to top; If the wiring is done from behind the screen, standing behind the screen to view it is the same as in front of the screen, the number tube should be inserted with the circuit number first, and then with the corresponding marking sleeve. The marking sleeves at both ends of the wire should match the secondary diagram, and the direction should be consistent with the direction shown in the following figure:

  4、下線工藝要求4.1.下線前應(yīng)根據(jù)裝置的結(jié)構(gòu)形式,元器件的安裝位置完整地構(gòu)思確定線束的走向,有幾個(gè)分支及交匯點(diǎn)以及固定、包扎的方式,然后按導(dǎo)線行的途徑大致量出導(dǎo)線的長度,同時(shí)應(yīng)考慮每一個(gè)接點(diǎn)接成弧形圈所需的長度,放50~100mm的余量后剪下所需導(dǎo)線,兩端再套上標(biāo)記套(號碼管)。4.2.用于二次回路的導(dǎo)線一般采用單芯硬線(BV),在經(jīng)常受彎曲處如插頭、過門線均采用多股塑料絕緣軟線(BVR)。4.3.抽屜式成套開關(guān)設(shè)備應(yīng)采用銅質(zhì)多股塑料絕緣軟線(BVR)。4.4.過門線下線長度應(yīng)能使門打開到極限位置而不受拉力影響。4.5.插件及抽屜內(nèi)凡采用軟聯(lián)接的插頭座下線長度應(yīng)保證插頭能有充分插拔余量如圖。4.6.裝有電子元件的控制裝置二次線應(yīng)考慮到遠(yuǎn)離一次回路,以防干擾。4.7.用于二次回路的導(dǎo)線顏色及線徑:設(shè)備內(nèi)部敷設(shè)一般用黑色,接地用黃綠雙色線,接地線不得小于2.5mm2,計(jì)量回路除電力和設(shè)計(jì)部門有要求時(shí),電流回路一律用4mm2,且用黃(A相)、綠(B相)、紅(C相)、淡蘭(N) 色線,電壓回路一律用2.5mm2,顏色同上。常規(guī)的電流回路用2.5mm2導(dǎo)線, 控制保護(hù)回路為1.5mm2,連接電子器件的小電流低電平電路允許采用小于1.5mm2的導(dǎo)線,但不得小于0.75mm2(采用1mm2如微機(jī)上)。4.8.二次線的敷設(shè)應(yīng)考慮到不得占用一次施工路徑及供用戶引進(jìn)引出電纜的空間位置,并注意留出適當(dāng)?shù)目瘴灰员WC與裸母線之間有足夠的距離,并要注意避開元件的噴弧范圍。

  4. Offline process requirements 4.1. Before going offline, the direction of the wire harness should be fully conceptualized and determined based on the structural form of the device, the installation position of the components, and the number of branches and intersections, as well as the methods of fixing and wrapping. Then, the length of the wire should be roughly measured according to the path of the wire row. At the same time, the length required for each contact to form an arc-shaped circle should be considered. After placing a margin of 50-100mm, the required wire should be cut off, and marking sleeves (number tubes) should be placed on both ends. 4.2. Wires used for secondary circuits generally use single core hard wires (BV), and multi stranded plastic insulated flexible wires (BVR) are used in frequently bent areas such as plugs and door wires. 4.3. Drawer type switchgear should use copper multi strand plastic insulated flexible wire (BVR). 4.4. The length of the wire passing through the door should be able to open the door to its maximum position without being affected by tension. 4.5. For plugs and drawers that use soft connections, the offline length of the plug socket should ensure that the plug has sufficient insertion and extraction allowance, as shown in the figure. 4.6. The secondary wires of control devices equipped with electronic components should be kept away from the primary circuit to prevent interference. 4.7. Color and diameter of wires used for secondary circuits: Black wires are generally used for internal installation of equipment, and yellow green dual color wires are used for safety grounding. The grounding wire should not be less than 2.5mm2. For metering circuits, except for those required by the power and design departments, 4mm2 wires should be used for current circuits, and yellow (A-phase), green (B-phase), red (C-phase), and light blue (N) wires should be used. 2.5mm2 wires should be used for voltage circuits, with the same color as above. Conventional current circuits use 2.5mm2 wires, while control and protection circuits use 1.5mm2 wires. Small current low-level circuits connected to electronic devices are allowed to use wires smaller than 1.5mm2, but not less than 0.75mm2 (1mm2 is recommended for microcomputers). 4.8. The laying of secondary lines should take into account not occupying the primary construction path and the space for users to introduce and exit cables, and pay attention to leaving appropriate space to ensure sufficient safety distance between the bare busbar, and avoid the arc spraying range of components.

  5、端子安裝與固定5.1.開關(guān)柜內(nèi)端子應(yīng)集中安裝成排,按端子的數(shù)量可排成單排或多排端子,位置垂直從上到下,柜頂從后到前,水平從左到右(正視);接線應(yīng)與二次圖紙一致性。5.2.端子排安裝位置:高壓柜應(yīng)裝于儀表室內(nèi),低壓柜一般型應(yīng)裝于門鏈側(cè)垂直安裝;抽出式低壓柜進(jìn)線、母聯(lián)柜應(yīng)于鉸鏈側(cè)垂直安裝,特殊情況(無法垂直安裝)允許在主開關(guān)上側(cè)合適位水平安裝,但應(yīng)注意飛狐距離及導(dǎo)電部位距離。5.3.端子裝配時(shí),始末兩端必須裝以擋板,不同安裝單元的端子排也應(yīng)在始末端安裝擋板。端子排上逢5遇10應(yīng)寫明其順序號。

  5. Terminal installation and fixation 5.1. The terminals inside the switchgear should be centrally installed in rows, which can be arranged in single or multiple rows according to the number of terminals. The positions should be vertical from top to bottom, cabinet top from back to front, and horizontal from left to right (front view); The wiring should be consistent with the secondary drawing. 5.2. Terminal block installation position: The high-voltage cabinet should be installed in the instrument room, and the low-voltage cabinet should generally be installed vertically on the door chain side; The incoming line of the pull-out low-voltage cabinet and the busbar cabinet should be installed vertically on the hinge side. In special circumstances (where vertical installation is not possible), it is allowed to be installed horizontally in a suitable position on the upper side of the main switch, but attention should be paid to the flying fox distance and the distance between conductive parts. 5.3. During terminal assembly, baffles must be installed at both ends, and baffles should also be installed at the beginning and end of terminal blocks for different installation units. The sequence number should be clearly indicated for every 5 and 10 on the terminal block.

  6、行線、接線工藝要求6.1.行線方式有完全行線槽行線,行線槽與成束捆扎混合行線及成束線捆扎行線等型式,采用行線槽行線方式。6.2.行線時(shí)自上而下地將線束理成塔形或多邊形(線束太大時(shí)也可理成圓形),然后分路,并將上下筆直的線路放在外檔(往往是主干線的長線束放外層),將中途要折彎的線路順序放入內(nèi)檔,盡量避免線間和層間交叉,特別是必須理直,這樣線束從始終被整齊的蓋住易于美觀,接線頭從線束下或中經(jīng)背面繞過線束成弧形接入配件接線樁,線頭拉出的根部必須捆扎。如下圖:6.3.二次回路的導(dǎo)線線束敷設(shè)過程中需要彎曲轉(zhuǎn)換方向時(shí),用手指進(jìn)行彎曲后再直或橫行走,不得使用夾咀或其它鋒利工具彎曲,以保證導(dǎo)線絕緣層不受損傷。當(dāng)線束過大確實(shí)需要借助工具彎曲時(shí),應(yīng)選用不帶棱形鉗齒的工具進(jìn)行。6.4.線束分支處原則上應(yīng)遵從小線束服從大線束的原則,即一般情況不改變主線束的走線路徑,小線束通過橫或豎折彎方式從大線束中分出,線束折彎處兩邊就近必須捆扎。線束在行線過程不允許出現(xiàn)有斜拉現(xiàn)象,除過門線及部分要跨越障礙的場合外一律采用或豎或橫的兩種行線方式。且所有扎線處不得有凹凸不直或有歪斜現(xiàn)象。如下圖:?6.5.用行線槽行線時(shí)行線槽應(yīng)敷設(shè)在柜(箱)的兩側(cè)或底部,若是元件布置排列明顯和線束較多時(shí)也可在中間敷設(shè),裝于引出線的下面,行線槽的安裝部位一般以垂直和水平為主。6.6.行線槽的安裝應(yīng)采用尼龍鉚釘或其它絕緣件進(jìn)行緊固,行線槽出線口不允許有毛刺。6.7.當(dāng)用纏繞管捆扎時(shí),對固定的線束選用的纏繞管其內(nèi)徑是線束的二分之一左右,活動(dòng)的線束選用的纏繞管其內(nèi)徑接近線束的外徑。6.8.纏繞在線束上的纏繞管其間距約為纏繞管本身的寬度。6.9.對1.5mm2及其以下的導(dǎo)線線束,應(yīng)采用全長包扎,對2.5mm2及其以上的導(dǎo)線線束,可采用分段包扎,包扎時(shí)每隔100~150mm左右均勻地扎一段,每段約5圈。6.11.捆扎帶的抽緊程度以線束被捆線基本抽緊為準(zhǔn),不能損傷導(dǎo)線的絕緣層,抽緊捆線后留2mm左右,多余的用斜口鉗剪去。6.12.捆扎好的線束應(yīng)逐段立即填入扁形線夾,拉直結(jié)束擰緊線夾,邊扎邊固定直全部結(jié)束,線夾夾持部的線束應(yīng)先用塑料膠帶包扎妥善后方可填入線夾固扎線間距應(yīng)盡量統(tǒng)一,線夾固定后的線束應(yīng)無晃動(dòng)現(xiàn)象。6.13.線束多不得超過24根,每層多不得超過6根,如實(shí)際需要較多根數(shù)時(shí),盡可能采用行線槽方法,為保證線束美觀整齊,應(yīng)在各層線間墊上硬質(zhì)卡紙或硬質(zhì)塑料薄片,卡片寬度根據(jù)每層線列實(shí)際寬度確定,以不露線束兩側(cè)導(dǎo)線為界,該位置應(yīng)有扎線捆扎牢固,線束粗細(xì)可按實(shí)際導(dǎo)線根數(shù)確定,一般為單層二根,雙層四根六根,三層九根十二根,四層二十二十四根。見圖B:6.14.二次回路的導(dǎo)線線束不準(zhǔn)在導(dǎo)電部件和元器件本身上固定和敷設(shè)(框架式斷路器除外),也不許直接敷設(shè)在金屬鐵板上,必須騰空3~5mm或?qū)Ь€包以塑料絕緣帶,采用支承樣板鐵條敷設(shè)線束時(shí),樣板鐵條必須包以塑料絕緣帶。6.15.在經(jīng)過包扎的樣板鐵上敷設(shè)線束的包扎應(yīng)按如下:a)先用塑料布一端插入線束中間加以抽緊。b)將導(dǎo)線整齊排列成多邊形或塔形。c)然后包扎2~5層,包扎后用捆扎帶抽緊,且捆扎帶尾朝上,等全部完工后,齊根剪去帶尾。7.16.不在樣板鐵上敷設(shè)線束的包扎,將導(dǎo)線理順整齊排列成近似于圓形的線束,用捆扎帶包扎,線束中間的扎線處要均勻,其橫向扎線間距不得大于150mm,縱向間距不得大于200mm,扎線處要求扎緊,用手滑動(dòng),不得松動(dòng)。6.17.線束在柜內(nèi)敷設(shè)時(shí)線束與金屬柜體之間應(yīng)用絕緣線夾進(jìn)行固定。線夾間距水平方向不大于300mm,垂直方向不大于400mm,離線束轉(zhuǎn)角處30mm左右,必須配有絕緣線夾將其固定。6.18.對角鋼結(jié)構(gòu)的箱柜應(yīng)采用支件在適當(dāng)位置緊固,并安裝線夾,對需在安裝板,面板上固定線束的,應(yīng)在適當(dāng)位置設(shè)絕緣線夾進(jìn)行緊固。6.19.導(dǎo)線與線束需要穿過金屬板時(shí),必須在金屬板的穿孔處加裝橡膠圈或齒形帶。交流回路的導(dǎo)線在穿過鋼制金屬隔板時(shí),該回路所有相線(包括中性線)均應(yīng)從同一孔中穿過。6.20.絕緣導(dǎo)線不允許貼近具有不同電位的裸露的帶電部位。線束與帶電體之間的距離不小于15mm。6.21.過門的線束兩端要用線夾壓緊,過門線應(yīng)套波紋管呈“U”形或“S”形。線束的長度應(yīng)保證門及導(dǎo)電物件開啟關(guān)閉時(shí)線束不得疊死,在開啟及關(guān)閉過程中不應(yīng)擦門框,同時(shí)應(yīng)確保門開啟≥120°。6.22.二次回路的導(dǎo)線線端裸露部位之間及導(dǎo)線線端裸露部位與金屬骨架的電氣間隙不應(yīng)小于4mm,爬電距離不小于6mm。6.23.行線時(shí)不允許損傷柜體表面涂層,安裝和接線過程中不能損壞電器元件。6.24.行線過程中,不允許使任何異物落入元器件內(nèi),特別是有觸點(diǎn)的元器件的觸點(diǎn)間隙內(nèi)或磁性元器件的線圈間隙內(nèi)以及斷路器和刀開關(guān)的滅弧室內(nèi),以免引起配件卡死或短路。6.25.在一般情況下導(dǎo)線不允許彎許多類似彈簧狀的圓圈后接線,但接地線和元器件有活動(dòng)接點(diǎn)的連接線除外,接地線和有活動(dòng)連接線的圈數(shù)限定5圈,如下圖:6.26.元件本身引線與導(dǎo)線的連接必須配有接線片或小接線過渡端子,不允許直接搭接。

  6. 6.1 Requirements for Wiring and Wiring Process 6.1. Wiring methods include fully slotted wiring, mixed wiring with bundled wiring, and bundled wiring. It is recommended to use slotted wiring. 6.2. When wiring, the wire harness should be arranged in a tower or polygon shape from top to bottom (circular shape can also be used if the harness is too large), and then divided. The straight lines should be placed on the outer shelf (usually the longest line of the main line should be placed on the outer shelf), and the lines that need to be bent in the middle should be placed on the inner shelf in order to avoid crossing between lines and layers as much as possible. Especially, the top layer must be straightened so that the harness is covered by a neat top layer from beginning to end, making it easy to look beautiful. The wiring head should be bent around the harness from the bottom or middle to the back and connected to the accessory wiring post. The root of the wire head pulled out must be tied. As shown in the following figure: 6.3. When the wiring harness of the secondary circuit needs to be bent and changed direction during the laying process, it should be bent with fingers before walking straight or horizontally. Clamps or other sharp tools should not be used to bend, to ensure that the insulation layer of the wire is not damaged. When the wire harness is too large and needs to be bent with the help of tools, tools without angular pliers should be used. 6.4. In principle, the branching of the wire harness should follow the principle of small wire harnesses obeying large wire harnesses, that is, in general, the routing path of the main wire harness should not be changed. The small wire harness should be separated from the large wire harness by horizontal or vertical bending, and the two sides of the wire harness bending must be tied nearby. During the wiring process, it is not allowed to have any diagonal pulling phenomenon. Except for the door line and some situations where obstacles need to be crossed, both vertical and horizontal wiring methods must be used. And all cable ties must not have any unevenness or skewness. As shown in the figure below:? 6.5. When using cable trays for wiring, the cable trays should be laid on both sides or at the bottom of the cabinet (box). If the components are arranged clearly and there are many wiring harnesses, they can also be laid in the middle and installed under the lead out wires. The installation position of the cable trays is generally vertical and horizontal. 6.6. The installation of cable trunking should be fastened with nylon rivets or other insulating components, and the outlet of the cable trunking should not have burrs. 6.7. When bundling with a winding tube, the inner diameter of the winding tube selected for the fixed wire harness is about half of the wire harness, and the inner diameter of the winding tube selected for the movable wire harness is close to the outer diameter of the wire harness. 6.8. The spacing between the winding tubes wound on the wire harness is approximately the width of the winding tubes themselves. 6.9. For wire harnesses of 1.5mm2 and below, full length wrapping should be used. For wire harnesses of 2.5mm2 and above, segmented wrapping can be used. When wrapping, a section should be evenly tied every 100-150mm, with about 5 turns per section. 6.11. The tightness of the binding tape should be based on the basic tightness of the wire harness being tied, and the insulation layer of the wire should not be damaged. After tightening the tied wire, leave about 2mm, and cut off the excess with diagonal pliers. 6.12. The bundled wire harness should be immediately filled into the flat wire clamp section by section. After straightening, tighten the wire clamp and fix it while tying until it is completely finished. The wire harness at the clamping part of the wire clamp should be wrapped properly with plastic tape before being filled in. The spacing between the wire clamps should be as uniform as possible, and the wire harness fixed by the wire clamp should be free of shaking. 6.13. The maximum number of wire harnesses shall not exceed 24, and the maximum number of wires per layer shall not exceed 6. If a large number of wires are actually required, the method of using cable trays shall be used as much as possible. To ensure the beauty and neatness of the wire harness, hard cardboard or hard plastic sheets shall be placed between each layer of wires. The width of the card shall be determined according to the actual width of each layer of wire columns, with the wires on both sides of the wire harness not exposed as the boundary. The position shall be firmly tied with zip ties. The thickness of the wire harness can be determined according to the actual number of wires, generally two in a single layer, four to six in a double layer, nine to twelve in a three layer, and twenty to twenty-four in a four. Refer to Figure B: 6.14. The wiring harness of the secondary circuit is not allowed to be fixed or laid on conductive parts and components themselves (except for frame type circuit breakers), nor is it allowed to be directly laid on metal plates. It must be empty by 3-5mm or wrapped with plastic insulation tape. When laying the wiring harness with supporting sample iron bars, the sample iron bars must be wrapped with plastic insulation tape. 6.15. The wiring harness should be wrapped on the wrapped sample iron as follows: a) First, insert one end of plastic cloth into the middle of the wiring harness and tighten it. b) Arrange the wires neatly into a polygon or tower shape. c) Then wrap it in 2-5 layers, tighten it with a tie tape, and keep the end of the tie tape facing upwards. After all is completed, cut off the ends of the tie tape completely. 7.16. Do not wrap the wire harness on the sample iron, arrange the wires neatly into a circular harness, wrap them with bundling tape, and ensure that the middle of the harness is evenly tied. The horizontal spacing between the ties should not exceed 150mm, and the vertical spacing should not exceed 200mm. The ties should be tightly tied, slid by hand, and not loose. 6.17. When the wiring harness is laid inside the cabinet, insulated wire clamps should be used to fix it between the wiring harness and the metal cabinet body. The spacing between wire clamps should not exceed 300mm in the horizontal direction and 400mm in the vertical direction, and around 30mm at the corner of the wire harness. Insulated wire clamps must be provided to fix it. 6.18. Boxes and cabinets with diagonal steel structures should be fastened at appropriate positions using supports and equipped with wire clamps. For those that require fixing wire harnesses on installation plates or panels, insulated wire clamps should be installed at appropriate positions for fastening. 6.19. When wires and harnesses need to pass through metal plates, rubber rings or toothed belts must be installed at the perforations of the metal plates. When the wires of the AC circuit pass through the steel metal partition, all phase wires (including neutral wires) of the circuit should pass through the same hole. 6.20. Insulated wires are not allowed to be close to exposed live parts with different potentials. The distance between the wire harness and the charged body shall not be less than 15mm. 6.21. The two ends of the wire harness passing through the door shall be clamped tightly with wire clamps, and the wire passing through the door shall be wrapped in a corrugated pipe in a "U" or "S" shape. The length of the wiring harness should ensure that the wiring harness does not stack when the door and conductive objects are opened and closed. The door frame should not be wiped during the opening and closing process, and the door opening should be ≥ 120 °. 6.22. The electrical clearance between exposed wire ends of the secondary circuit and between exposed wire ends and the metal frame should not be less than 4mm, and the creepage distance should not be less than 6mm. 6.23. It is not allowed to damage the surface coating of the cabinet during wiring, and electrical components should not be damaged during installation and wiring. 6.24. During the wiring process, it is not allowed for any foreign objects to fall into the components, especially in the contact gaps of components with contacts or in the coil gaps of magnetic components, as well as in the arc extinguishing chambers of circuit breakers and knife switches, to avoid component jamming or short circuits. 6.25. In general, wires are not allowed to be bent into many spring like circles for wiring, except for connecting wires with movable contacts between grounding wires and components. The number of turns for grounding wires and connecting wires with movable contacts is limited to 5, as shown in the following figure: 6.26. The connection between the component's lead wire and the wire must be equipped with terminal blocks or small wire transition terminals, and direct overlap is not allowed.

  6.27.行線時(shí)如遇導(dǎo)線太短,必須調(diào)換,不允許將導(dǎo)線加長。6.28.產(chǎn)品上所有的接線端子,應(yīng)根據(jù)接線圖的要求,標(biāo)注或套上標(biāo)記套(回路標(biāo)號)。6.29.有接地母線的產(chǎn)品,每個(gè)互感器必須下一根接地線接地母線排上,其余產(chǎn)品互感器相連后必須下一根接地導(dǎo)線到接地螺釘。6.30.二次線接到元器件樁頭時(shí),線不能貼牢元器件敷設(shè)或用吸盤固定在元器件上,上線方式也應(yīng)有序,二次線不能遮住元器件一次接線樁頭,應(yīng)考慮到配件本身的發(fā)熱及檢修拆換方便。6.31.二次線在敷設(shè)途中如遇有金屬障礙時(shí),應(yīng)加以彎曲越過,中間保持4mm以上的距離。

  6.27. If the wire is too short during wiring, it must be replaced and it is not allowed to lengthen the wire. 6.28. All wiring terminals on the product should be labeled or fitted with marking sleeves (circuit numbers) according to the requirements of the wiring diagram. 6.29. For products with grounding busbars, each transformer must have a grounding wire connected to the grounding busbar, and for other products, after connecting the transformers, a grounding wire must be connected to the grounding screw. 6.30. When connecting the secondary wire to the component pile head, the wire should not be firmly attached to the component or fixed on the component with suction cups. The wiring method should also be orderly, and the secondary wire should not cover the primary wiring pile head of the component. Consideration should be given to the heating of the accessories themselves and the convenience of maintenance and replacement. 6.31. If there is a metal obstacle during the laying of the secondary line, it should be bent and crossed, with a distance of at least 4mm in between.

  7、線頭制作及配件上線工藝要求線頭制作:即對線頭彎圓或冷壓銅制接線端頭。7.1.線頭制作時(shí)不能使導(dǎo)線的線芯和絕緣層受到損傷。7.2.剝線鉗刃口應(yīng)與線徑相匹配。7.3.壓線鉗的選擇不同的端頭應(yīng)分別采用相適應(yīng)的專用冷壓接鉗。a)預(yù)絕緣端頭壓線鉗口見圖1所示。b)裸端頭壓線鉗口見圖2所示。c)管形預(yù)絕緣端頭壓線鉗口見圖3所示。e)觸針式端頭壓線鉗口見圖4所示。7.4.線芯與端頭配合a)預(yù)絕緣端頭與導(dǎo)線的冷壓接后尺寸見圖5。b)管形預(yù)絕緣端頭與導(dǎo)線的冷壓后尺寸見圖6。c)裸端頭與導(dǎo)線的冷壓接后尺寸見圖7。d)觸針式端頭與導(dǎo)線冷壓接后的尺寸見圖87.5.對單芯導(dǎo)線線頭一般采用尖咀鉗或圓頭鉗進(jìn)行彎成單眼圈,彎圈后的導(dǎo)線其線芯不允許受到損傷,圓圈應(yīng)基本成圓形且其內(nèi)徑應(yīng)比電器接點(diǎn)螺栓直徑大0.5~1mm,羊眼圈末端距導(dǎo)線絕緣應(yīng)有2~4mm距離,保證裝入接點(diǎn)時(shí)墊圈不壓著導(dǎo)線絕緣,導(dǎo)線接入接點(diǎn)后,從垂直方向看去不得有線芯彎成的羊眼圈露出;單眼圈呈順時(shí)針接入螺釘。7.6.工藝要求a)端子的接線均應(yīng)采用冷壓接端頭,線芯直接接于電器接線端子只有該接線端子適應(yīng)于這種方法才能允許。b)預(yù)絕緣端頭壓接后,絕緣部分不能出現(xiàn)破損或開裂。c)導(dǎo)線芯插入冷壓接端頭后,不能有末插入的線芯或線芯露出端子管外部以及絞線的現(xiàn)象,更不能剪斷線芯。(見圖所示)d)冷壓接端頭的規(guī)格必須與所接入的導(dǎo)線直徑相吻合,導(dǎo)線與冷壓接端頭的配合見本守則的規(guī)定。e)剝?nèi)?dǎo)線絕緣層后,應(yīng)盡快與冷壓接端頭壓接,避免線芯產(chǎn)生氧化膜或粘有油污。f)壓接后導(dǎo)線與端頭的抗拉強(qiáng)度應(yīng)不低于導(dǎo)體本身抗拉強(qiáng)度的60%。不同端頭與導(dǎo)線壓接拉力負(fù)荷值見表。端頭規(guī)格與端頭配合的導(dǎo)線截面積mm2拉力負(fù)荷值,NN預(yù)絕緣端頭裸端頭0.5.50.5.560751.0.00.75.7590120

  7. Wire head production and accessories online process requirements: Wire head production: that is, bending the wire head into a circle or cold pressing copper terminal head. 7.1. During the production of wire ends, the core and insulation layer of the wire must not be damaged. 7.2. The cutting edge of the wire stripping pliers should match the wire diameter. 7.3. The selection of crimping pliers should use specialized cold crimping pliers that are suitable for different ends. a) The pre insulated end crimping clamp is shown in Figure 1. b) The bare end crimping jaws are shown in Figure 2. c) The clamping jaws for the pre insulated end of the tube are shown in Figure 3. e) The needle type end crimping jaws are shown in Figure 4. 7.4. Core and Terminal Coordination a) The dimensions of the pre insulated terminal and the wire after cold crimping are shown in Figure 5. b) The dimensions of the pre insulated end of the tube and the wire after cold pressing are shown in Figure 6. c) The dimensions of the bare end and wire after cold crimping are shown in Figure 7. d) The dimensions of the contact pin end and the wire after cold crimping are shown in Figure 87.5. For single core wire ends, sharp pliers or round pliers are generally used to bend them into a single eye circle. The wire core of the bent wire should not be damaged. The circle should be basically circular and its inner diameter should be 0.5-1mm larger than the diameter of the electrical contact bolt. The end of the eye circle should be 2-4mm away from the wire insulation to ensure that the gasket does not press the wire insulation when installing the contact. After the wire is connected to the contact, the eye circle formed by the wire core bending should not be exposed when viewed from the vertical direction; The single eye socket is connected clockwise with screws. 7.6. Process requirements: a) Cold crimping terminals should be used for terminal wiring, and the wire core should be directly connected to the electrical terminal. Only when the terminal is suitable for this method can it be allowed. b) After crimping the pre insulated end, the insulation part should not be damaged or cracked. c) After inserting the wire core into the cold crimping end, there should be no un inserted wire core or wire core exposed outside the terminal tube or stranded wire, and the wire core should not be cut. (As shown in the figure) d) The specifications of the cold crimping terminal must match the diameter of the connected wire, and the coordination between the wire and the cold crimping terminal is specified in this code of practice. e) After stripping the insulation layer of the wire, it should be crimped with the cold crimping end as soon as possible to avoid the formation of oxide film or oil stains on the wire core. f) The tensile strength of the wire and end after crimping should not be less than 60% of the tensile strength of the conductor itself. The load values of the crimping tension between different ends and wires are shown in the table. Terminal specifications and cross-sectional area of the wire that matches the terminal in mm2 tensile load value, NN pre insulated terminal bare end 0.5.50.560751.000.75.7590120

  11001601.5.51.5.51402202.5.52.5.51903204.0.042755006.0.06360630g)針形端頭、片形端頭和管形端頭長度,應(yīng)根據(jù)所接入的端子情況,接觸長度應(yīng)與端子相一致或少長出壓線螺釘;二個(gè)壓線螺釘時(shí)(如電度表),其端頭長度應(yīng)保證二個(gè)螺釘均接觸固定。(見圖所示)?h)觸針式端頭j)通常不允許二根導(dǎo)線接入一個(gè)冷壓接端頭,因接線端子限制必須采用時(shí),宜先采用二根導(dǎo)線壓接的專用端頭,否則宜選用大一級或大二級的冷壓接端頭。預(yù)絕緣端頭與二根導(dǎo)線壓接配合仍應(yīng)符合要求,避免出現(xiàn)裸線芯露出絕緣管外的情況。(見圖所示)k)一個(gè)接線端子接入二個(gè)冷壓接端頭時(shí),應(yīng)根據(jù)不同的端子接線形式,選擇適合的冷壓接端頭。①螺釘串插式平板連接宜采用圓形和叉形端頭(見圖a所示)。允許兩種不同的端頭同時(shí)使用,且允許不同大小線徑的冷壓接端頭接線,此時(shí)大線徑在下面,小線徑在上面。連接時(shí)兩端頭采用背靠背的形式,相疊或張開相互夾角不小于30?(見圖b所示)。②螺釘串插式弧形板連接宜采用針形端頭或管形端頭,也可采用圓形端頭。采用兩個(gè)針形或管形端頭時(shí),線徑或端頭大小應(yīng)相同(見圖a所示)。③平板壓接式連接宜采用片形端頭。(見圖b所示④弧形板壓接式連接宜采用針形和管形端頭。但線徑或端頭大小應(yīng)相同。(見圖c所示)7.7.對多芯導(dǎo)線線徑剝頭后,應(yīng)在導(dǎo)線端部壓上冷壓接端頭,具體做法是:用剝線鉗剝?nèi)?~7mm長的塑料皮,并將號碼管套上,打開冷壓鉗,將冷壓鉗端子標(biāo)記向上,放入冷壓鉗相應(yīng)的鉗口處,把導(dǎo)線插入冷壓端子內(nèi),然后進(jìn)行壓接,必需加壓鉗口完全閉合方可放開,并達(dá)到如下要求:1)壓接冷壓接端頭時(shí),線芯頂端應(yīng)露出插套0.5~1mm,不帶絕緣護(hù)套的壓接端頭,導(dǎo)線絕緣層與插套之間的過渡間隙應(yīng)控制在0.5mm范圍內(nèi)。2)冷壓鉗錐口的中心應(yīng)對準(zhǔn)冷壓接端頭插套焊縫中心,壓痕在無焊縫處。7.8.低壓抽屜柜接線頭一律采用冷壓端子。7.9.同一電器單位應(yīng)用同一種導(dǎo)線端頭制作方法。7.10.冷壓接端頭的選用,應(yīng)根據(jù)元器件上接線端頭的型式不同而不同:當(dāng)電接點(diǎn)兩邊沒有擋板時(shí)必需選用TO型冷壓如接地線樁頭、電線與母排的連接處、CT、PT及大部分儀表上,樣式見圖:?7.11.冷壓接端頭的規(guī)格應(yīng)根據(jù)導(dǎo)線的截面積或設(shè)計(jì)要求進(jìn)行選用,具體見下表1:7.12.剝線的長度應(yīng)按電器元件接線板上螺釘?shù)闹睆絹泶_定如表2所示:螺釘直徑(mm)34568剝線長度(mm)1518212428

  11001601.5.51.5.51402202.5.52.5.5519032040.0.042755006.0.06360630g) The length of needle shaped end, sheet shaped end, and tube shaped end should be consistent with the terminal or at least extend the crimping screw according to the condition of the connected terminal; When using two crimping screws (such as an electricity meter), the length of the end should ensure that both screws are in contact and fixed. (As shown in the picture)? h) Pin type terminals (j) usually do not allow two wires to be connected to one cold crimping terminal. When it is necessary to use terminals due to limitations, it is advisable to first use a dedicated terminal for crimping two wires. Otherwise, it is recommended to use a cold crimping terminal that is one or two levels larger. The pre insulated end should still meet the requirements for crimping with two wires to avoid the situation where the bare wire core is exposed outside the insulation tube. When one terminal is connected to two cold crimping terminals (as shown in the figure), the appropriate cold crimping terminal should be selected according to the different terminal connection forms. ① Screw string insertion flat plate connections should use circular and fork shaped ends (as shown in Figure a). Allow two different types of terminals to be used simultaneously, and allow cold crimping terminals of different sizes to be connected, with the larger wire diameter at the bottom and the smaller wire diameter at the top. When connecting, the two ends should be in a back-to-back form, with an angle of no less than 30 degrees between each other when overlapping or opening? (As shown in Figure b). ② The screw string insertion arc-shaped plate connection should use needle shaped or tube shaped ends, and circular ends can also be used. When using two needle or tube shaped ends, the wire diameter or end size should be the same (as shown in Figure a). ③ Flat press fit connections should use sheet shaped ends. (As shown in Figure b, it is recommended to use needle shaped and tube shaped ends for the arc-shaped plate crimping connection.). But the wire diameter or end size should be the same. 7.7. After stripping the diameter of the multi-core wire, a cold crimping end should be pressed onto the wire end. The specific method is to use wire stripping pliers to strip off the 5-7mm long plastic skin, and cover the number tube. Open the cold crimping pliers, mark the terminal of the cold crimping pliers upwards, place it in the corresponding clamp of the cold crimping pliers, insert the wire into the cold crimping terminal, and then perform crimping. It is necessary to apply pressure until the clamp is completely closed before releasing it, and meet the following requirements: 1) When crimping the cold crimping end, the top of the wire core should be exposed 0.5-1mm from the socket, and the crimping end without insulation sheath should have a transition gap between the wire insulation layer and the socket. It should be controlled within a range of 0.5mm. 2) The center of the cold press clamp cone should be aligned with the center of the cold press joint end socket weld, and the indentation should be made at the location without weld. 7.8. Cold pressed terminals shall be used for all wiring heads of low-voltage drawer cabinets. 7.9. The same electrical unit should use the same method for making wire ends. 7.10. The selection of cold crimping terminals should vary depending on the type of terminals on the components: when there are no baffles on both sides of the electrical contact, TO type cold crimping must be selected, such as grounding wire pile heads, wire and busbar connections, CT, PT, and most instruments. The style is shown in the figure:? 7.11. The specifications of cold crimping terminals should be selected according to the cross-sectional area of the wire or design requirements, as shown in Table 1: 7.12. The length of wire stripping should be determined according to the diameter of the screw on the electrical component wiring board, as shown in Table 2: screw diameter (mm) 34568 wire stripping length (mm) 1518212428

  TUTO型冷壓頭規(guī)格尺寸7.13.元器件的接線方式有:a)直接接入法b)焊接型接法c)螺釘壓接型接法 d)插接型接法⑴直接接入法:如電度表及抽屜式二次插件上用瓦型墊圈壓接的接線方式,用瓦型墊圈壓接接線線頭制作應(yīng)達(dá)到如下要求:1)用瓦型墊圈壓接的導(dǎo)線,導(dǎo)線的線芯應(yīng)露出瓦型墊圈0.5~1.0mm。2)接入一根導(dǎo)線時(shí),導(dǎo)線應(yīng)順螺釘旋緊方向插入。3)兩根接入瓦型墊圈接線端的導(dǎo)線,線徑不相同時(shí),其中線徑細(xì)的單芯導(dǎo)線可將導(dǎo)線線芯彎曲180度后再插入,如下圖,多芯導(dǎo)線須用冷壓接頭。⑵焊接型接線原則:1)焊接型接線端要求焊點(diǎn)光亮、牢固,不允許出現(xiàn)虛焊、漏焊。2)導(dǎo)線元器件上的焊接處在焊接前應(yīng)其表面氧化層,并進(jìn)行搪錫處理。3)焊接時(shí)可以用少量松香或少量中性助焊劑,不允許使用酸性助焊劑進(jìn)行焊接。4)焊接完畢后,焊點(diǎn)應(yīng)當(dāng)用灑精棉擦試清潔。5)焊接時(shí)應(yīng)注意保護(hù)導(dǎo)線的絕緣層不被燙傷,或產(chǎn)生明顯的熱收縮現(xiàn)象。⑶螺釘壓接型接線:即用螺釘壓接彎圓導(dǎo)線或壓接TO TU型壓接端頭的多芯導(dǎo)線接線原則:1)被壓接的彎圓型導(dǎo)線,導(dǎo)線的彎圓方向應(yīng)與螺釘?shù)男o方向相一致,方向不允許逆轉(zhuǎn)。2)兩根彎圓導(dǎo)線接入接線端時(shí),彎圓導(dǎo)線之間必須墊入與螺釘相應(yīng)的銅質(zhì)平墊圈,并且導(dǎo)線規(guī)格不同時(shí),應(yīng)將截面積大的導(dǎo)線放在接線端底部。3)彎圓導(dǎo)線接入接線端時(shí),導(dǎo)線的絕緣層不允許被平墊壓住,兩根TO、TU型壓接端頭的導(dǎo)線應(yīng)“背對背”接入接線端。4)二次線接母排上時(shí),必須在排上打孔,2.5mm2以下的導(dǎo)線用M5螺釘孔,4mm2以上的用M6螺釘連接,一個(gè)孔允許接2根線,該孔另一面不允許再接線。二次線不允許從母排相間穿過。5)一般電流電壓互感器及部分儀表以及抽屜式斷路器的次插件樁頭大多無彈墊,上線后易松。⑷插接型接線在線芯上插接插針型冷壓銅接端頭后,用適當(dāng)工具壓接牢固,再插接在元器件相應(yīng)的插接片上,插接后不得有松動(dòng)現(xiàn)象。7.14.樁頭上線的工藝要求⑴一般情況每個(gè)接線端點(diǎn)只允許連接一根導(dǎo)線接頭多允許連接二根導(dǎo)線,并在導(dǎo)線壓接端頭的上下側(cè)均應(yīng)配有平墊圈,導(dǎo)線壓接端頭必須可靠推入且螺絲需擰緊不得有松動(dòng)現(xiàn)象,對未接線的緊固件在完工時(shí)應(yīng)逐個(gè)擰緊避免松動(dòng)脫落,螺釘端頭伸出螺母應(yīng)符合露出(2~5牙)的標(biāo)準(zhǔn)。⑵連接元器件上的接線頭必須彎成賀弧形,有利于檢修,線也不易損傷。同一臺同一類電器或同種方案的幾臺巨子元件接線后所彎成的圓弧大小和高度應(yīng)統(tǒng)一。⑶凡是直流電流表須配有分流器時(shí),其二次接線應(yīng)直接連接,不得經(jīng)過端子板,當(dāng)線徑為1.5平方時(shí)其長度不得超過3m。⑷連接到發(fā)熱元件(如管形電阻,板形電阻,瓷盤電阻)上的導(dǎo)線,應(yīng)從其側(cè)方或下方引出,離發(fā)熱元件30mm以上,當(dāng)接入小于或等于15W管形電阻時(shí)應(yīng)剝?nèi)?dǎo)線絕緣層20mm左右長度,接入大于15W管形電阻時(shí)應(yīng)剝?nèi)?dǎo)線絕緣約40mm。然后套上耐熱瓷珠,再進(jìn)行連接,焊接處應(yīng)牢固無虛焊、漏焊。⑸對于小于75W的管形電阻允許用螺桿串心后一頭固定在骨架或支架上。對大于75W的管形電阻應(yīng)用螺桿串心后二頭固定后才能接線。對時(shí)間繼電器上的附加電阻不能懸掛焊接,應(yīng)固定在面板支件上。⑹導(dǎo)線接到電器元件接線端頭時(shí),導(dǎo)線不允許把元件上的接線端頭遮住,應(yīng)方便拆裝。

  The specifications and dimensions of the TUTO type cold press head are 7.13. The wiring methods for components include: a) direct connection method, b) welding connection method, c) screw compression connection method, d) plug-in connection method. (1) direct connection method: for example, the wiring method of crimping with a tile washer on an electricity meter and a drawer type secondary plug, the wire head made by crimping with a tile washer should meet the following requirements: 1) For wires crimped with a tile washer, the wire core of the wire should protrude 0.5-1.0mm from the tile washer. 2) When connecting a wire, the wire should be inserted in the direction of tightening the screw. 3) When two wires with different diameters are connected to the tile shaped gasket terminal, the single core wire with a thinner diameter can be bent 180 degrees and then inserted, as shown in the figure below. Multi core wires require cold pressed joints. ⑵ Welding type wiring principle: 1) Welding type wiring terminals require bright and firm welding points, and no virtual welding or leakage is allowed. 2) Before welding, the surface oxide layer of the solder joints on the wire components should be removed and treated with tin coating. 3) A small amount of rosin or neutral flux can be used during welding, and acidic flux is not allowed for welding. 4) After welding, the welding points should be wiped clean with a cotton swab. 5) During welding, attention should be paid to protecting the insulation layer of the wire from burns or significant thermal shrinkage. ⑶ Screw crimping type wiring: that is, using screws to crimp bent round wires or TO TU type crimping terminals for multi-core wire wiring principles: 1) The bending direction of the crimped bent round wire should be consistent with the tightening direction of the screw, and the direction should not be reversed. 2) When two bent round wires are connected to the terminal, copper flat washers corresponding to the screws must be inserted between the bent round wires, and when the wire specifications are different, the wire with a larger cross-sectional area should be placed at the bottom of the terminal. 3) When a bent round wire is connected to the terminal, the insulation layer of the wire is not allowed to be pressed down by a flat pad. The wires of the two TO and TU type crimping terminals should be connected back to back to the terminal. 4) When connecting the secondary wire to the busbar, holes must be drilled on the busbar. For wires with a diameter of less than 2.5mm2, M5 screw holes should be used, and for wires with a diameter of more than 4mm2, M6 screws should be used for connection. Two wires are allowed to be connected to one hole, but no further wiring is allowed on the other side of the hole. Secondary lines are not allowed to pass through the busbar alternately. 5) The secondary plug heads of general current and voltage transformers, some instruments, and drawer type circuit breakers mostly have no spring pads and are prone to loosening after being put online. ⑷ Plug in type wiring: After inserting the pin type cold pressed copper terminal on the wire core, use appropriate tools to press it firmly, and then plug it into the corresponding socket of the component. There should be no looseness after insertion. 7.14. Process requirements for the installation of pile heads (1) Generally, only one wire is allowed to be connected to each wiring endpoint, and a maximum of two wires are allowed to be connected to the joint. Flat washers should be provided on both the upper and lower sides of the wire crimping end. The wire crimping end must be reliably pushed in and the screws must be tightened without loosening. Unwired fasteners should be tightened one by one upon completion to avoid loosening and falling off. The protruding nut of the screw end should meet the standard of exposing (2-5 teeth). The connectors on the connected components must be bent into a curved shape, which is conducive to maintenance and the wires are not easily damaged. The size and height of the arc formed by connecting several giant components of the same type or scheme should be uniform. When a DC ammeter needs to be equipped with a shunt, the secondary wiring should be directly connected and not pass through the terminal board. When the wire diameter is 1.5 square meters, its length should not exceed 3 meters. The wire connected to the heating element (such as tube shaped resistor, plate shaped resistor, porcelain plate resistor) should be led out from its side or below, at least 30mm away from the heating element. When connecting a tube shaped resistor less than or equal to 15W, the insulation layer of the wire should be stripped off by about 20mm, and when connecting a tube shaped resistor greater than 15W, the insulation of the wire should be stripped off by about 40mm. Then, heat-resistant ceramic beads should be placed on it before connection, and the welding should be firm without virtual welding or leakage. ⑸ For tubular resistors less than 75W, it is allowed to fix one end of the screw after threading on the skeleton or bracket. For tubular resistors with a power greater than 75W, the screw should be threaded and fixed at both ends before wiring. The additional resistor on the time relay cannot be suspended and welded, but should be fixed on the panel support. When connecting the wire to the terminal of an electrical component, the wire should not cover the terminal of the component and should be easy to disassemble and assemble.

  8、二次行線部分示例及符號牌形式8.1.端子排的配線心⑴導(dǎo)線接入端子前應(yīng)做成圓弧形狀4其圓弧半徑不小于10mm,圓弧跨度長視標(biāo)記套管長度而定。(見圖a)⑵導(dǎo)線接入端子排前的分線:1)導(dǎo)線從上往下接入端子排。(見圖b)(見圖c)2)導(dǎo)線從下往上接入端子排。3)導(dǎo)線從端子排中間分別向上、下方向接入端子排。(見圖c)4)插銷式扎帶捆扎方式導(dǎo)線接入端子排,分線前應(yīng)捆扎,一次多分3根導(dǎo)線或分出接入3只端子排距離的導(dǎo)線。(見圖e)5)卷式結(jié)束保護(hù)帶包扎方式導(dǎo)線接入端子排,應(yīng)按接入端子排的導(dǎo)線順序,相對于接線端子位置,逐漸分出。(見圖f)6)行線槽方式導(dǎo)線接入端子排,行線槽與端子排的安裝距離應(yīng)為40mm~60mm之間,導(dǎo)線相對于接線端子位置從行線槽出線孔逐漸分出;行線槽孔距應(yīng)選擇與端子板厚度相同,導(dǎo)線分出平直,高度一致。(見圖d)8.2.電器元件端子的配線⑴導(dǎo)線接入端子前應(yīng)做成圓弧形狀,其圓弧半徑不小于10mm,跨度長視標(biāo)記套管長度而定。(見圖a)⑵導(dǎo)線距離端子接線管端部的彎曲應(yīng)符合規(guī)定要求,因裝配限制接線端頭必需彎曲時(shí),只允許彎曲一次,且折彎角度不得大于45°。(見圖b)⑶LA、AD11型按鈕、信號燈配線見圖c所示,⑷LW5型轉(zhuǎn)換開關(guān)配線見圖d所示,導(dǎo)線跨度不應(yīng)大于120mm。⑸LW12型轉(zhuǎn)換開關(guān)配線見圖e所示,導(dǎo)線跨度不應(yīng)大于120mm。⑹LW2型轉(zhuǎn)換開關(guān)配線見圖f所示,導(dǎo)線跨度不應(yīng)大于150mm和90mm。⑺42L6儀表配線見圖g所示,導(dǎo)線彎曲跨度不應(yīng)超過儀表邊緣。⑻6L2儀表配線見圖h所示,導(dǎo)線超出儀表上部邊緣不大于6mm,左右與邊緣平齊。?⑼繼電器的配線見圖i所示。⑽電器接線端子位于并突出于電器中間段的配線見圖所示,導(dǎo)線與電器面的角度不大于30°。⑾儀表門的配線(見圖k所示)各電器元件配線方向應(yīng)從導(dǎo)線束敷設(shè)相反的方向彎繞各電器元件的安裝應(yīng)端正,導(dǎo)線敷設(shè)應(yīng)盡量采用集中線束的方法。8.3.其他⑴二次電源線接線:──采用專用接線端頭,二次電源線用冷壓扁平快速端頭與之連接。(見圖I)──在母排上開4的孔或直接攻絲,采用M4螺釘連接。──導(dǎo)線長度應(yīng)留有適當(dāng)?shù)脑A?,并將其卷成螺旋形狀螺旋形?nèi)徑約8mm~10mm,繞3~5圈。(見圖m)8.4.保護(hù)接地⑴標(biāo)志和識別a)保護(hù)接地端子應(yīng)采用顏色標(biāo)志(黃-綠雙色的標(biāo)志)b)文字符號采用PE識別。圖形符號見圖n、圖O優(yōu)先選用圖O⑵接地保護(hù)的范圍a)所有作為隔離帶電導(dǎo)體的金屬隔板均應(yīng)有效地接地。石形笑設(shè)備的框架、儀用變壓器的金屬外殼、開關(guān)電器、儀繼電器的金屬外殼以及金屬手動(dòng)操作機(jī)構(gòu)均應(yīng)有效接c) 對于門、蓋板、覆板和類似部件,如果其上沒有安裝電氣設(shè)備則一般金屬螺釘連接或鍍鋅的金屬絞鏈連接就認(rèn)為保證了電的連續(xù)性:如果其上裝有額定電壓值超過42V的電氣設(shè)備時(shí),應(yīng)采用保護(hù)導(dǎo)體將這些部件和保護(hù)電路連接。8.5.二次行線部分示例及符號牌形式⑴分路部分接入單排儀表的線束布置示例:⑵分路部分到雙排儀表的線束,可用中間分線的布置⑶分路部分到按鈕,熔斷器,控制開關(guān)等部件的線束布置原則上按橫向?qū)ΨQ行走,如果受到位置上的限制,允許緊問對稱行走,所有接線應(yīng)有一定拋度,其拋度高為20mm左右。信號燈或按鈕雙排及雙排以上布置接線⑷分路部分到繼電器的線束,一律按水平居中向兩側(cè)分開的方向行走。到繼電器接線端的每根線應(yīng)略帶圓弧狀連接般圓弧如圖,力求同面板上的各種繼電保護(hù)回路圓弧──?⑸符號牌形式及編寫方法見下附圖,符號牌橫線上方編寫元件安裝序號如:1、1;橫線下方編寫元件符號。接線圖上有設(shè)計(jì)標(biāo)志時(shí)按圖紙要求編號。

  8. Example and symbol plate form of secondary wiring section 8.1. Wiring center of terminal block (1) The wire should be made into a circular arc shape before being connected to the terminal. The radius of the circular arc should not be less than 10mm, and the span length of the circular arc depends on the length of the marked sleeve. (See Figure a) ⑵ Wire distribution before connecting to the terminal block: 1) The wire is connected to the terminal block from top to bottom. (See Figure b) (See Figure c) 2) Connect the wire from bottom to top into the terminal block. 3) The wires are connected to the terminal block in both upward and downward directions from the middle of the terminal block. (See Figure c) 4) Pin type zip tie binding method: When connecting wires to terminal blocks, they should be tied before splitting. A maximum of 3 wires can be split at a time or wires that are separated and connected to a distance of 3 terminal blocks can be added. (See Figure e) 5) The wrapping method of the rolled end protective tape should gradually separate the wires connected to the terminal block in the order of the wires connected to the terminal block, relative to the position of the terminal block. (See Figure f) 6) The wire is connected to the terminal block through the wire slot method, and the installation distance between the wire slot and the terminal block should be between 40mm and 60mm. The wire gradually branches out from the wire slot outlet hole relative to the wiring terminal position; The distance between the wire slot holes should be selected to be the same as the thickness of the terminal board, with straight wire branches and consistent height. (See Figure d) 8.2. Wiring of Electrical Component Terminals (1) Before connecting the wire to the terminal, it should be made into a circular arc shape with a radius of not less than 10mm, and the span length depends on the length of the marked sleeve. (See Figure a) ⑵ The bending of the wire from the end of the terminal conduit should meet the specified requirements. Due to assembly limitations, when the terminal must be bent, only one bending is allowed, and the bending angle should not exceed 45 °. (See Figure b) ⑶ The wiring of LA and AD11 buttons and signal lights is shown in Figure c, (4) The wiring of LW5 type conversion switch is shown in Figure d, and the wire span should not exceed 120mm. (5) The wiring of LW12 type conversion switch is shown in Figure e, and the wire span should not exceed 120mm. (6) The wiring of LW2 type conversion switch is shown in Figure f, and the wire span should not exceed 150mm and 90mm. (7) The wiring of 42L6 instrument is shown in Figure g, and the wire bending span should not exceed the edge of the instrument. The wiring of the 6L2 instrument is shown in Figure h. The wire should extend no more than 6mm beyond the upper edge of the instrument and be level with the edge on both sides.? The wiring of the relay is shown in Figure i. The wiring of the electrical wiring terminal located in and protruding from the middle section of the electrical appliance is shown in the diagram, and the angle between the wire and the electrical surface is not greater than 30 °. The wiring direction of each electrical component in the instrument door (as shown in Figure k) should be bent in the opposite direction of the wire harness. The installation of each electrical component should be upright, and the wire harness should be laid in a centralized manner as much as possible. 8.3. Other (1) Secondary power cord wiring: - Use dedicated wiring terminals, and connect the secondary power cord to it with cold pressed flat quick connectors. (See Figure I) - Drill 4 holes or directly tap on the busbar, and use M4 screws for connection. The length of the wire should have an appropriate margin, and it should be coiled into a spiral shape with an inner diameter of about 8mm to 10mm, and wound 3 to 5 times. (See Figure m) 8.4. Protective Grounding ⑴ Marking and Identification a) Protective grounding terminals should use color markings (yellow green dual color markings) b) Text symbols should be identified by PE. The graphic symbols are shown in Figure n and Figure O, and Figure O (2) is preferred for the range of grounding protection. (a) All metal partitions used as isolated live conductors should be effectively grounded. The frame of the Shixingxiao equipment, the metal casing of the instrument transformer, the metal casing of the switchgear, the metal casing of the instrument relay, and the metal manual operating mechanism should all be effectively connected. c) For doors, cover plates, cladding, and similar components, if no electrical equipment is installed on them, metal screw connections or galvanized metal hinge connections are generally considered to ensure electrical continuity. If electrical equipment with a rated voltage exceeding 42V is installed on them, protective conductors should be used to connect these components to the protective circuit. 8.5. Examples of Secondary Wiring Parts and Symbol Plate Forms: (1) Wiring Harness Layout Example for Branch Connection to Single Row Instruments: (2) Wiring Harness from Branch Connection to Double Row Instruments can be arranged with a middle branch line. (3) Wiring Harness Layout from Branch Connection to Buttons, Fuses, Control Switches, and Other Components should be arranged symmetrically in the horizontal direction. If restricted by position, it is allowed to walk symmetrically. All wiring should have a certain degree of throw, with a throw height of about 20mm. The wiring of signal lights or buttons should be arranged in double rows or more. The wiring harness from the branching part to the relay should be horizontally centered and move in a direction separated from both sides. Each wire to the relay terminal should have a slightly curved connection as shown in the diagram, striving to match the various relay protection circuit arcs on the panel? The form and writing method of the symbol board are shown in the attached figure. The component installation number is written above the horizontal line of the symbol board, such as: 1, 1; Write component symbols below the horizontal line. When there are design symbols on the wiring diagram, they should be numbered according to the requirements of the drawing.

  9、檢驗(yàn)規(guī)則⑴接線完工后一定要打掃柜內(nèi)與周圍的雜物,進(jìn)行自檢。⑵接線頭螺釘有無松動(dòng)現(xiàn)象,如有松動(dòng),即加以緊固。⑶所行線路要平、直、齊、牢。⑷所有元件不接線的端子,都需配齊螺釘、螺母、墊圈等并要求緊固。⑸按技術(shù)要求的各項(xiàng)規(guī)定,進(jìn)行元件規(guī)格的外觀檢查,并符合圖紙要求。⑹核對導(dǎo)線選用規(guī)格是否正確,導(dǎo)線絕緣層及導(dǎo)體有無損傷。⑺檢查扎線質(zhì)量、彎曲半徑是否符合要求,方向是否正確。⑻檢查此次回路的電氣間隙、爬電距離、距離是否符合規(guī)定要求。⑼按原理接線圖及施工接線圖,檢查導(dǎo)線連接是否正確。⑽按有關(guān)技術(shù)條件和標(biāo)準(zhǔn),進(jìn)行出廠檢試。1、工藝流程準(zhǔn)備相關(guān)圖紙、規(guī)范書(領(lǐng)料單)及工藝文件→領(lǐng)取所需的電器元件及各種規(guī)格導(dǎo)線和輔助材料→熟悉圖紙并核對元器件的位置和規(guī)格→標(biāo)識元器件的符號牌-構(gòu)思線束的走向及幾個(gè)關(guān)鍵的分支及交匯點(diǎn)的處理方法→下線配線→接線→整理線束→質(zhì)量自檢和清理機(jī)柜→報(bào)檢

  9. Inspection rule ⑴ After the wiring is completed, it is necessary to clean the cabinet and surrounding debris for self inspection. Check for any looseness in the wiring head screws. If there is any looseness, tighten them. The route should be flat, straight, even, and secure. All components without wiring terminals must be equipped with screws, nuts, washers, etc. and tightened. According to the technical requirements, conduct a visual inspection of the component specifications and ensure compliance with the drawing requirements. ⑹ Check whether the specifications of the selected wires are correct, and whether the insulation layer and conductor of the wires are damaged. Check the quality of the cable tie, whether the bending radius meets the requirements, and whether the direction is correct. Check whether the electrical clearance, creepage distance, and safety distance of this circuit meet the specified requirements. According to the principle wiring diagram and construction wiring diagram, check whether the wire connections are correct. Conduct factory inspection according to relevant technical conditions and standards. 1. Preparation of relevant drawings, specifications (material requisition) and process documents for the process flow → Collection of required electrical components, various specifications of wires and auxiliary materials → Familiarity with the drawings and verification of the position and specifications of the components → Identification of symbol plates for the components - Concept of the direction of the wiring harness and the handling methods for several key branches and intersections → Offline wiring → Wiring → Sorting of wiring harnesses → Quality self inspection and cleaning of the cabinet → Inspection report

  2、技術(shù)要求2.1.嚴(yán)格依照二次圖紙要求、按工藝文件要求、按技術(shù)標(biāo)準(zhǔn)要求制做,接線要準(zhǔn)確,途徑要簡捷,布局合理、橫平豎直、美觀大方、牢固清晰。2.2.選用的二次導(dǎo)線應(yīng)采用電壓不低于500V銅芯塑料絕緣導(dǎo)線(BV、BVR)其截面要求電流回路采用2.5mm2,電壓回路采用1.5mm2,其顏色一般為黑色,接地采用黃綠雙色導(dǎo)線,截面不小于2.5mm2,電子器件小電流、低電平允許采用小于1.5mm2,但不得小于0.75mm2。計(jì)量回路當(dāng)電力和設(shè)計(jì)部門有特殊要求時(shí),電流回路為4mm2、電壓回路為2.5mm2、零線為2.5mm2,且顏色分別為:A相黃色、B相綠色、C相紅色,零線為藍(lán)色配置。2.3.二次回路的線束布置一定要有規(guī)律,原則上應(yīng)以活動(dòng)門鉸鏈側(cè)由上而下,布置做到合理、牢固、,分流的線束應(yīng)做到橫平豎直、層次分明、整齊美觀,除必要彎曲(如轉(zhuǎn)換方向)外,不能有彎斜、扭曲的現(xiàn)象。捆扎方式要規(guī)范、牢固可靠、均勻。2.4.所有的門應(yīng)有可靠牢固的接地裝置(接地柱),應(yīng)與柜體柜架構(gòu)成一個(gè)良好、接地體系。裝置采用螺栓不能小于6mm,且接地點(diǎn)上應(yīng)平整、光滑、無漆漬、無銹痕,連接的導(dǎo)線不能小于2.5mm2(建議采用不小于4mm2裸銅軟線)的黃綠雙色軟線。2.5.二次回路的線束不準(zhǔn)在導(dǎo)電部件敷設(shè),高壓柜線束與導(dǎo)電部位的凈距離3kV不小于75mm,6kV不小于100mm,10kV不小于125mm,35kV不小于300mm。導(dǎo)線線部裸露部位之間及裸露部位與金屬框架的電氣間隙應(yīng)不小于4mm,爬電距離應(yīng)不小于6mm2.6.電器元件上接點(diǎn)一般只連接一根導(dǎo)線,必要時(shí)允許連接二根,其工藝要求應(yīng)符合以下要求,所有接點(diǎn)與導(dǎo)線連接時(shí)應(yīng)有防松措施,擰緊后應(yīng)有2~5扣螺紋,所有的緊固件(螺絲、墊圈、螺母)均應(yīng)為鍍鋅件。導(dǎo)線中間不允許有接頭。2.7.電流回路的連接應(yīng)通過端子連接,且端子應(yīng)為試驗(yàn)型接觸良好的端子,同時(shí)電流回路應(yīng)有可靠的接地,方式應(yīng)符合相關(guān)要求。所有端子間的連接應(yīng)采用專用連接片連接。2.8.為了保證接點(diǎn)的可靠,所有導(dǎo)線(除單根導(dǎo)線需做羊眼圈外)應(yīng)有冷壓接頭(冷壓線鼻),冷壓接點(diǎn)選用的規(guī)格與制作應(yīng)符合其工藝要求。a)預(yù)絕緣端頭與導(dǎo)線的冷壓接后尺寸見圖a。b)管形預(yù)絕緣端頭與導(dǎo)線的冷壓后尺寸見圖b。c)裸端頭與導(dǎo)線的冷壓接后尺寸見圖c。d)觸針式端頭與導(dǎo)線冷壓接后的尺寸見圖d。2.9.為了嚴(yán)肅二次圖紙與實(shí)物的一致性,便于有關(guān)部門驗(yàn)證及維護(hù)的方便,所有導(dǎo)線端頭與元器件應(yīng)有明顯正確的標(biāo)志,即導(dǎo)線的標(biāo)記套、元器件符號牌。導(dǎo)線標(biāo)記套的規(guī)格應(yīng)與導(dǎo)線線徑匹配,接線后的方向應(yīng)與圖紙一致,元器件的符號牌粘貼位置應(yīng)醒目、正確、美觀,便于觀看與核對。

  2. Technical requirement 2.1. Strictly follow the requirements of the secondary drawings, process documents, and technical standards for manufacturing. The wiring should be accurate, the route should be simple, the layout should be reasonable, horizontal and vertical, beautiful and elegant, and firm and clear. 2.2. The selected secondary wire should be a copper core plastic insulated wire (BV, BVR) with a voltage of not less than 500V. The cross-sectional area of the current circuit should be 2.5mm2, and the voltage circuit should be 1.5mm2, generally black in color. The safety grounding should use a yellow green dual color wire with a cross-sectional area of not less than 2.5mm2. For small current and low level electronic devices, it is allowed to use a cross-sectional area of less than 1.5mm2, but not less than 0.75mm2. When there are special requirements from the power and design departments for the metering circuit, the current circuit is 4mm2, the voltage circuit is 2.5mm2, and the neutral wire is 2.5mm2, and the colors are: yellow for phase A, green for phase B, red for phase C, and blue for the neutral wire configuration. 2.3. The wiring harness layout of the secondary circuit must be regular. In principle, it should be arranged from top to bottom on the hinge side of the movable door, and the layout should be reasonable, firm, and safe. The diverted wiring harness should be horizontal and vertical, with clear layers, neat and beautiful. Except for necessary bending (such as changing direction), there should be no tilting or twisting phenomenon. The bundling method should be standardized, firm, reliable, and even. 2.4. All doors should have reliable and secure grounding devices (grounding columns), which should form a good and safe grounding system with the cabinet frame. The device should use bolts with a diameter of no less than 6mm, and the grounding point should be flat, smooth, without paint stains or rust marks. The connected wires should not be less than 2.5mm2 (it is recommended to use bare copper flexible wires with a diameter of no less than 4mm2) with yellow green dual color flexible wires. 2.5. The wiring harness of the secondary circuit is not allowed to be laid on conductive parts. The net distance between the high-voltage cabinet wiring harness and conductive parts should be no less than 75mm for 3kV, no less than 100mm for 6kV, no less than 125mm for 10kV, and no less than 300mm for 35kV. The electrical gap between the exposed parts of the wire and the metal frame should not be less than 4mm, and the creepage distance should not be less than 6mm2.6. Generally, only one wire is connected to the contact on the electrical component, and if necessary, two wires are allowed to be connected. The process requirements should meet the following requirements. All contacts should have anti loosening measures when connected to the wire, and after tightening, there should be 2-5 threads. All fasteners (screws, washers, nuts) should be galvanized. No joints are allowed in the middle of the wire. 2.7. The connection of the current circuit should be made through terminals, and the terminals should be of the test type with good contact. At the same time, the current circuit should have a reliable grounding method that meets relevant requirements. All connections between terminals should be made using dedicated connectors. 2.8. In order to ensure the safety and reliability of the contacts, all wires (except for single wires that require sheep eye circles) should have cold pressed joints (cold pressed wire noses), and the specifications and production of cold pressed contacts should meet their process requirements. a) The dimensions of the pre insulated end and the wire after cold crimping are shown in Figure a. b) The dimensions of the tubular pre insulated end and the wire after cold crimping are shown in Figure b. c) The dimensions of the bare end and the wire after cold crimping are shown in Figure c. d) The dimensions of the contact pin end and the wire after cold crimping are shown in Figure d. 2.9. In order to ensure the consistency between the secondary drawing paper and the actual product, and for the convenience of verification and maintenance by relevant departments, all wire ends and components should have clear and correct markings, namely wire marking sleeves and component symbol plates. The specifications of the wire marking sleeve should match the wire diameter, and the direction after wiring should be consistent with the drawing. The symbol plate of the component should be pasted in a prominent, correct, and beautiful position for easy viewing and verification.

  3、配線的準(zhǔn)備工作3.1.領(lǐng)取圖紙,技術(shù)規(guī)范資料(規(guī)范書),并將其消化和策劃。3.2.按圖紙領(lǐng)取元器件及各種規(guī)格導(dǎo)線和輔助材料。3.3.準(zhǔn)備好必需的輔助材料如梅花螺絲刀,吸盤,壓線鉗,鋼板尺,BVR銅線,扎帶,冷壓端頭,斜口等。4.4.然后按照盤面布置圖安裝元器件如指示燈和轉(zhuǎn)換開關(guān)等,并且在各個(gè)元器件下粘貼標(biāo)簽(標(biāo)簽長度為15mm,字體為4:3)標(biāo)簽應(yīng)貼在同一條直線上如圖所示。3.5.然后用工具(工具的寬度為13mm)畫線如圖A所示,對于單排貼吸盤的指示燈粘貼吸盤時(shí)距離應(yīng)大于工具的寬度大約20-22mm。3.6.確定所畫線平直后進(jìn)行粘貼吸盤如圖B3.7.根據(jù)導(dǎo)線規(guī)格選擇號碼套管,并按圖紙及配線的先后次序打印標(biāo)記套(回路標(biāo)號),標(biāo)記套(回路標(biāo)號)應(yīng)清楚、牢固、完整不脫色,編寫元件符號牌要求字跡清晰端正,不得涂改、不褪色。3.8.按圖紙與規(guī)范書的要求領(lǐng)取并核對元器件型號規(guī)格和安裝位置。3.9.所有接入電器元件的導(dǎo)線端頭均應(yīng)套入號碼管(標(biāo)記套),除電器元件本身連線外,號碼管套入導(dǎo)線后的閱示方向原則:站在產(chǎn)品正前方水平方向從左到右的讀入方向;垂直方向從下到上的讀入方向;若為屏后走線時(shí),站在屏后觀看與屏前相同,號碼管原則上應(yīng)先套入回路號,然后套入對標(biāo)記套,導(dǎo)線兩端頭的標(biāo)記套應(yīng)與二次圖相符,方向一律按下圖所示方向:

  3. Preparation work for wiring 3.1. Obtain drawings, technical specification documents (specification books), and digest and plan them. 3.2. Obtain components, various specifications of wires, and auxiliary materials according to the drawings. 3.3. Prepare necessary auxiliary materials such as a Phillips screwdriver, suction cup, crimping tool, steel ruler, BVR copper wire, zip ties, cold pressed end caps, slanted mouth, etc. 4.4. Then install components such as indicator lights and conversion switches according to the panel layout diagram, and paste labels (label length of 15mm, font of 4:3) under each component. The labels should be pasted on the same straight line as shown in the figure. 3.5. Then use a tool (with a width of 13mm) to draw a line as shown in Figure A. For the indicator light with a single row of suction cups, the distance between the suction cups should be about 20-22mm greater than the width of the tool. 3.6. After confirming that the drawn line is straight, paste the suction cups as shown in Figure B3.7. Select the number sleeve according to the wire specifications, and print the marking sleeve (circuit number) in the order of the drawing and wiring. The marking sleeve (circuit number) should be clear, firm, and complete without fading. The writing of the component symbol plate requires clear and upright handwriting, and should not be altered or faded. 3.8. Obtain and verify the component model, specifications, and installation position according to the requirements of the drawings and specifications. 3.9. All wire ends connected to electrical components should be inserted into a marking sleeve. Except for the wiring of the electrical components themselves, the reading direction of the marking sleeve after inserting the wire should follow the principle of standing in front of the product in a horizontal direction from left to right; Vertical reading direction from bottom to top; If the wiring is done from behind the screen, standing behind the screen to view it is the same as in front of the screen, the number tube should be inserted with the circuit number first, and then with the corresponding marking sleeve. The marking sleeves at both ends of the wire should match the secondary diagram, and the direction should be consistent with the direction shown in the following figure:

  4、下線工藝要求4.1.下線前應(yīng)根據(jù)裝置的結(jié)構(gòu)形式,元器件的安裝位置完整地構(gòu)思確定線束的走向,有幾個(gè)分支及交匯點(diǎn)以及固定、包扎的方式,然后按導(dǎo)線行的途徑大致量出導(dǎo)線的長度,同時(shí)應(yīng)考慮每一個(gè)接點(diǎn)接成弧形圈所需的長度,放50~100mm的余量后剪下所需導(dǎo)線,兩端再套上標(biāo)記套(號碼管)。4.2.用于二次回路的導(dǎo)線一般采用單芯硬線(BV),在經(jīng)常受彎曲處如插頭、過門線均采用多股塑料絕緣軟線(BVR)。4.3.抽屜式成套開關(guān)設(shè)備應(yīng)采用銅質(zhì)多股塑料絕緣軟線(BVR)。4.4.過門線下線長度應(yīng)能使門打開到極限位置而不受拉力影響。4.5.插件及抽屜內(nèi)凡采用軟聯(lián)接的插頭座下線長度應(yīng)保證插頭能有充分插拔余量如圖。4.6.裝有電子元件的控制裝置二次線應(yīng)考慮到遠(yuǎn)離一次回路,以防干擾。4.7.用于二次回路的導(dǎo)線顏色及線徑:設(shè)備內(nèi)部敷設(shè)一般用黑色,接地用黃綠雙色線,接地線不得小于2.5mm2,計(jì)量回路除電力和設(shè)計(jì)部門有要求時(shí),電流回路一律用4mm2,且用黃(A相)、綠(B相)、紅(C相)、淡蘭(N) 色線,電壓回路一律用2.5mm2,顏色同上。常規(guī)的電流回路用2.5mm2導(dǎo)線, 控制保護(hù)回路為1.5mm2,連接電子器件的小電流低電平電路允許采用小于1.5mm2的導(dǎo)線,但不得小于0.75mm2(采用1mm2如微機(jī)上)。4.8.二次線的敷設(shè)應(yīng)考慮到不得占用一次施工路徑及供用戶引進(jìn)引出電纜的空間位置,并注意留出適當(dāng)?shù)目瘴灰员WC與裸母線之間有足夠的距離,并要注意避開元件的噴弧范圍。

  4. Offline process requirements 4.1. Before going offline, the direction of the wire harness should be fully conceptualized and determined based on the structural form of the device, the installation position of the components, and the number of branches and intersections, as well as the methods of fixing and wrapping. Then, the length of the wire should be roughly measured according to the path of the wire row. At the same time, the length required for each contact to form an arc-shaped circle should be considered. After placing a margin of 50-100mm, the required wire should be cut off, and marking sleeves (number tubes) should be placed on both ends. 4.2. Wires used for secondary circuits generally use single core hard wires (BV), and multi stranded plastic insulated flexible wires (BVR) are used in frequently bent areas such as plugs and door wires. 4.3. Drawer type switchgear should use copper multi strand plastic insulated flexible wire (BVR). 4.4. The length of the wire passing through the door should be able to open the door to its maximum position without being affected by tension. 4.5. For plugs and drawers that use soft connections, the offline length of the plug socket should ensure that the plug has sufficient insertion and extraction allowance, as shown in the figure. 4.6. The secondary wires of control devices equipped with electronic components should be kept away from the primary circuit to prevent interference. 4.7. Color and diameter of wires used for secondary circuits: Black wires are generally used for internal installation of equipment, and yellow green dual color wires are used for safety grounding. The grounding wire should not be less than 2.5mm2. For metering circuits, except for those required by the power and design departments, 4mm2 wires should be used for current circuits, and yellow (A-phase), green (B-phase), red (C-phase), and light blue (N) wires should be used. 2.5mm2 wires should be used for voltage circuits, with the same color as above. Conventional current circuits use 2.5mm2 wires, while control and protection circuits use 1.5mm2 wires. Small current low-level circuits connected to electronic devices are allowed to use wires smaller than 1.5mm2, but not less than 0.75mm2 (1mm2 is recommended for microcomputers). 4.8. The laying of secondary lines should take into account not occupying the primary construction path and the space for users to introduce and exit cables, and pay attention to leaving appropriate space to ensure sufficient safety distance between the bare busbar, and avoid the arc spraying range of components.

  5、端子安裝與固定5.1.開關(guān)柜內(nèi)端子應(yīng)集中安裝成排,按端子的數(shù)量可排成單排或多排端子,位置垂直從上到下,柜頂從后到前,水平從左到右(正視);接線應(yīng)與二次圖紙一致性。5.2.端子排安裝位置:高壓柜應(yīng)裝于儀表室內(nèi),低壓柜一般型應(yīng)裝于門鏈側(cè)垂直安裝;抽出式低壓柜進(jìn)線、母聯(lián)柜應(yīng)于鉸鏈側(cè)垂直安裝,特殊情況(無法垂直安裝)允許在主開關(guān)上側(cè)合適位水平安裝,但應(yīng)注意飛狐距離及導(dǎo)電部位距離。5.3.端子裝配時(shí),始末兩端必須裝以擋板,不同安裝單元的端子排也應(yīng)在始末端安裝擋板。端子排上逢5遇10應(yīng)寫明其順序號。

  5. Terminal installation and fixation 5.1. The terminals inside the switchgear should be centrally installed in rows, which can be arranged in single or multiple rows according to the number of terminals. The positions should be vertical from top to bottom, cabinet top from back to front, and horizontal from left to right (front view); The wiring should be consistent with the secondary drawing. 5.2. Terminal block installation position: The high-voltage cabinet should be installed in the instrument room, and the low-voltage cabinet should generally be installed vertically on the door chain side; The incoming line of the pull-out low-voltage cabinet and the busbar cabinet should be installed vertically on the hinge side. In special circumstances (where vertical installation is not possible), it is allowed to be installed horizontally in a suitable position on the upper side of the main switch, but attention should be paid to the flying fox distance and the distance between conductive parts. 5.3. During terminal assembly, baffles must be installed at both ends, and baffles should also be installed at the beginning and end of terminal blocks for different installation units. The sequence number should be clearly indicated for every 5 and 10 on the terminal block.

  6、行線、接線工藝要求6.1.行線方式有完全行線槽行線,行線槽與成束捆扎混合行線及成束線捆扎行線等型式,采用行線槽行線方式。6.2.行線時(shí)自上而下地將線束理成塔形或多邊形(線束太大時(shí)也可理成圓形),然后分路,并將上下筆直的線路放在外檔(往往是主干線的長線束放外層),將中途要折彎的線路順序放入內(nèi)檔,盡量避免線間和層間交叉,特別是必須理直,這樣線束從始終被整齊的蓋住易于美觀,接線頭從線束下或中經(jīng)背面繞過線束成弧形接入配件接線樁,線頭拉出的根部必須捆扎。如下圖:6.3.二次回路的導(dǎo)線線束敷設(shè)過程中需要彎曲轉(zhuǎn)換方向時(shí),用手指進(jìn)行彎曲后再直或橫行走,不得使用夾咀或其它鋒利工具彎曲,以保證導(dǎo)線絕緣層不受損傷。當(dāng)線束過大確實(shí)需要借助工具彎曲時(shí),應(yīng)選用不帶棱形鉗齒的工具進(jìn)行。6.4.線束分支處原則上應(yīng)遵從小線束服從大線束的原則,即一般情況不改變主線束的走線路徑,小線束通過橫或豎折彎方式從大線束中分出,線束折彎處兩邊就近必須捆扎。線束在行線過程不允許出現(xiàn)有斜拉現(xiàn)象,除過門線及部分要跨越障礙的場合外一律采用或豎或橫的兩種行線方式。且所有扎線處不得有凹凸不直或有歪斜現(xiàn)象。如下圖:?6.5.用行線槽行線時(shí)行線槽應(yīng)敷設(shè)在柜(箱)的兩側(cè)或底部,若是元件布置排列明顯和線束較多時(shí)也可在中間敷設(shè),裝于引出線的下面,行線槽的安裝部位一般以垂直和水平為主。6.6.行線槽的安裝應(yīng)采用尼龍鉚釘或其它絕緣件進(jìn)行緊固,行線槽出線口不允許有毛刺。6.7.當(dāng)用纏繞管捆扎時(shí),對固定的線束選用的纏繞管其內(nèi)徑是線束的二分之一左右,活動(dòng)的線束選用的纏繞管其內(nèi)徑接近線束的外徑。6.8.纏繞在線束上的纏繞管其間距約為纏繞管本身的寬度。6.9.對1.5mm2及其以下的導(dǎo)線線束,應(yīng)采用全長包扎,對2.5mm2及其以上的導(dǎo)線線束,可采用分段包扎,包扎時(shí)每隔100~150mm左右均勻地扎一段,每段約5圈。6.11.捆扎帶的抽緊程度以線束被捆線基本抽緊為準(zhǔn),不能損傷導(dǎo)線的絕緣層,抽緊捆線后留2mm左右,多余的用斜口鉗剪去。6.12.捆扎好的線束應(yīng)逐段立即填入扁形線夾,拉直結(jié)束擰緊線夾,邊扎邊固定直全部結(jié)束,線夾夾持部的線束應(yīng)先用塑料膠帶包扎妥善后方可填入線夾固扎線間距應(yīng)盡量統(tǒng)一,線夾固定后的線束應(yīng)無晃動(dòng)現(xiàn)象。6.13.線束多不得超過24根,每層多不得超過6根,如實(shí)際需要較多根數(shù)時(shí),盡可能采用行線槽方法,為保證線束美觀整齊,應(yīng)在各層線間墊上硬質(zhì)卡紙或硬質(zhì)塑料薄片,卡片寬度根據(jù)每層線列實(shí)際寬度確定,以不露線束兩側(cè)導(dǎo)線為界,該位置應(yīng)有扎線捆扎牢固,線束粗細(xì)可按實(shí)際導(dǎo)線根數(shù)確定,一般為單層二根,雙層四根六根,三層九根十二根,四層二十二十四根。見圖B:6.14.二次回路的導(dǎo)線線束不準(zhǔn)在導(dǎo)電部件和元器件本身上固定和敷設(shè)(框架式斷路器除外),也不許直接敷設(shè)在金屬鐵板上,必須騰空3~5mm或?qū)Ь€包以塑料絕緣帶,采用支承樣板鐵條敷設(shè)線束時(shí),樣板鐵條必須包以塑料絕緣帶。6.15.在經(jīng)過包扎的樣板鐵上敷設(shè)線束的包扎應(yīng)按如下:a)先用塑料布一端插入線束中間加以抽緊。b)將導(dǎo)線整齊排列成多邊形或塔形。c)然后包扎2~5層,包扎后用捆扎帶抽緊,且捆扎帶尾朝上,等全部完工后,齊根剪去帶尾。7.16.不在樣板鐵上敷設(shè)線束的包扎,將導(dǎo)線理順整齊排列成近似于圓形的線束,用捆扎帶包扎,線束中間的扎線處要均勻,其橫向扎線間距不得大于150mm,縱向間距不得大于200mm,扎線處要求扎緊,用手滑動(dòng),不得松動(dòng)。6.17.線束在柜內(nèi)敷設(shè)時(shí)線束與金屬柜體之間應(yīng)用絕緣線夾進(jìn)行固定。線夾間距水平方向不大于300mm,垂直方向不大于400mm,離線束轉(zhuǎn)角處30mm左右,必須配有絕緣線夾將其固定。6.18.對角鋼結(jié)構(gòu)的箱柜應(yīng)采用支件在適當(dāng)位置緊固,并安裝線夾,對需在安裝板,面板上固定線束的,應(yīng)在適當(dāng)位置設(shè)絕緣線夾進(jìn)行緊固。6.19.導(dǎo)線與線束需要穿過金屬板時(shí),必須在金屬板的穿孔處加裝橡膠圈或齒形帶。交流回路的導(dǎo)線在穿過鋼制金屬隔板時(shí),該回路所有相線(包括中性線)均應(yīng)從同一孔中穿過。6.20.絕緣導(dǎo)線不允許貼近具有不同電位的裸露的帶電部位。線束與帶電體之間的距離不小于15mm。6.21.過門的線束兩端要用線夾壓緊,過門線應(yīng)套波紋管呈“U”形或“S”形。線束的長度應(yīng)保證門及導(dǎo)電物件開啟關(guān)閉時(shí)線束不得疊死,在開啟及關(guān)閉過程中不應(yīng)擦門框,同時(shí)應(yīng)確保門開啟≥120°。6.22.二次回路的導(dǎo)線線端裸露部位之間及導(dǎo)線線端裸露部位與金屬骨架的電氣間隙不應(yīng)小于4mm,爬電距離不小于6mm。6.23.行線時(shí)不允許損傷柜體表面涂層,安裝和接線過程中不能損壞電器元件。6.24.行線過程中,不允許使任何異物落入元器件內(nèi),特別是有觸點(diǎn)的元器件的觸點(diǎn)間隙內(nèi)或磁性元器件的線圈間隙內(nèi)以及斷路器和刀開關(guān)的滅弧室內(nèi),以免引起配件卡死或短路。

  6. 6.1 Requirements for Wiring and Wiring Process 6.1. Wiring methods include fully slotted wiring, mixed wiring with bundled wiring, and bundled wiring. It is recommended to use slotted wiring. 6.2. When wiring, the wire harness should be arranged in a tower or polygon shape from top to bottom (circular shape can also be used if the harness is too large), and then divided. The straight lines should be placed on the outer shelf (usually the longest line of the main line should be placed on the outer shelf), and the lines that need to be bent in the middle should be placed on the inner shelf in order to avoid crossing between lines and layers as much as possible. Especially, the top layer must be straightened so that the harness is covered by a neat top layer from beginning to end, making it easy to look beautiful. The wiring head should be bent around the harness from the bottom or middle to the back and connected to the accessory wiring post. The root of the wire head pulled out must be tied. As shown in the following figure: 6.3. When the wiring harness of the secondary circuit needs to be bent and changed direction during the laying process, it should be bent with fingers before walking straight or horizontally. Clamps or other sharp tools should not be used to bend, to ensure that the insulation layer of the wire is not damaged. When the wire harness is too large and needs to be bent with the help of tools, tools without angular pliers should be used. 6.4. In principle, the branching of the wire harness should follow the principle of small wire harnesses obeying large wire harnesses, that is, in general, the routing path of the main wire harness should not be changed. The small wire harness should be separated from the large wire harness by horizontal or vertical bending, and the two sides of the wire harness bending must be tied nearby. During the wiring process, it is not allowed to have any diagonal pulling phenomenon. Except for the door line and some situations where obstacles need to be crossed, both vertical and horizontal wiring methods must be used. And all cable ties must not have any unevenness or skewness. As shown in the figure below:? 6.5. When using cable trays for wiring, the cable trays should be laid on both sides or at the bottom of the cabinet (box). If the components are arranged clearly and there are many wiring harnesses, they can also be laid in the middle and installed under the lead out wires. The installation position of the cable trays is generally vertical and horizontal. 6.6. The installation of cable trunking should be fastened with nylon rivets or other insulating components, and the outlet of the cable trunking should not have burrs. 6.7. When bundling with a winding tube, the inner diameter of the winding tube selected for the fixed wire harness is about half of the wire harness, and the inner diameter of the winding tube selected for the movable wire harness is close to the outer diameter of the wire harness. 6.8. The spacing between the winding tubes wound on the wire harness is approximately the width of the winding tubes themselves. 6.9. For wire harnesses of 1.5mm2 and below, full length wrapping should be used. For wire harnesses of 2.5mm2 and above, segmented wrapping can be used. When wrapping, a section should be evenly tied every 100-150mm, with about 5 turns per section. 6.11. The tightness of the binding tape should be based on the basic tightness of the wire harness being tied, and the insulation layer of the wire should not be damaged. After tightening the tied wire, leave about 2mm, and cut off the excess with diagonal pliers. 6.12. The bundled wire harness should be immediately filled into the flat wire clamp section by section. After straightening, tighten the wire clamp and fix it while tying until it is completely finished. The wire harness at the clamping part of the wire clamp should be wrapped properly with plastic tape before being filled in. The spacing between the wire clamps should be as uniform as possible, and the wire harness fixed by the wire clamp should be free of shaking. 6.13. The maximum number of wire harnesses shall not exceed 24, and the maximum number of wires per layer shall not exceed 6. If a large number of wires are actually required, the method of using cable trays shall be used as much as possible. To ensure the beauty and neatness of the wire harness, hard cardboard or hard plastic sheets shall be placed between each layer of wires. The width of the card shall be determined according to the actual width of each layer of wire columns, with the wires on both sides of the wire harness not exposed as the boundary. The position shall be firmly tied with zip ties. The thickness of the wire harness can be determined according to the actual number of wires, generally two in a single layer, four to six in a double layer, nine to twelve in a three layer, and twenty to twenty-four in a four. Refer to Figure B: 6.14. The wiring harness of the secondary circuit is not allowed to be fixed or laid on conductive parts and components themselves (except for frame type circuit breakers), nor is it allowed to be directly laid on metal plates. It must be empty by 3-5mm or wrapped with plastic insulation tape. When laying the wiring harness with supporting sample iron bars, the sample iron bars must be wrapped with plastic insulation tape. 6.15. The wiring harness should be wrapped on the wrapped sample iron as follows: a) First, insert one end of plastic cloth into the middle of the wiring harness and tighten it. b) Arrange the wires neatly into a polygon or tower shape. c) Then wrap it in 2-5 layers, tighten it with a tie tape, and keep the end of the tie tape facing upwards. After all is completed, cut off the ends of the tie tape completely. 7.16. Do not wrap the wire harness on the sample iron, arrange the wires neatly into a circular harness, wrap them with bundling tape, and ensure that the middle of the harness is evenly tied. The horizontal spacing between the ties should not exceed 150mm, and the vertical spacing should not exceed 200mm. The ties should be tightly tied, slid by hand, and not loose. 6.17. When the wiring harness is laid inside the cabinet, insulated wire clamps should be used to fix it between the wiring harness and the metal cabinet body. The spacing between wire clamps should not exceed 300mm in the horizontal direction and 400mm in the vertical direction, and around 30mm at the corner of the wire harness. Insulated wire clamps must be provided to fix it. 6.18. Boxes and cabinets with diagonal steel structures should be fastened at appropriate positions using supports and equipped with wire clamps. For those that require fixing wire harnesses on installation plates or panels, insulated wire clamps should be installed at appropriate positions for fastening. 6.19. When wires and harnesses need to pass through metal plates, rubber rings or toothed belts must be installed at the perforations of the metal plates. When the wires of the AC circuit pass through the steel metal partition, all phase wires (including neutral wires) of the circuit should pass through the same hole. 6.20. Insulated wires are not allowed to be close to exposed live parts with different potentials. The distance between the wire harness and the charged body shall not be less than 15mm. 6.21. The two ends of the wire harness passing through the door shall be clamped tightly with wire clamps, and the wire passing through the door shall be wrapped in a corrugated pipe in a "U" or "S" shape. The length of the wiring harness should ensure that the wiring harness does not stack when the door and conductive objects are opened and closed. The door frame should not be wiped during the opening and closing process, and the door opening should be ≥ 120 °. 6.22. The electrical clearance between exposed wire ends of the secondary circuit and between exposed wire ends and the metal frame should not be less than 4mm, and the creepage distance should not be less than 6mm. 6.23. It is not allowed to damage the surface coating of the cabinet during wiring, and electrical components should not be damaged during installation and wiring. 6.24. During the wiring process, it is not allowed for any foreign objects to fall into the components, especially in the contact gaps of components with contacts or in the coil gaps of magnetic components, as well as in the arc extinguishing chambers of circuit breakers and knife switches, to avoid component jamming or short circuits.

  6.25.在一般情況下導(dǎo)線不允許彎許多類似彈簧狀的圓圈后接線,但接地線和元器件有活動(dòng)接點(diǎn)的連接線除外,接地線和有活動(dòng)連接線的圈數(shù)限定5圈,如下圖:6.26.元件本身引線與導(dǎo)線的連接必須配有接線片或小接線過渡端子,不允許直接搭接。6.27.行線時(shí)如遇導(dǎo)線太短,必須調(diào)換,不允許將導(dǎo)線加長。6.28.產(chǎn)品上所有的接線端子,應(yīng)根據(jù)接線圖的要求,標(biāo)注或套上標(biāo)記套(回路標(biāo)號)。6.29.有接地母線的產(chǎn)品,每個(gè)互感器必須下一根接地線接地母線排上,其余產(chǎn)品互感器相連后必須下一根接地導(dǎo)線到接地螺釘。6.30.二次線接到元器件樁頭時(shí),線不能貼牢元器件敷設(shè)或用吸盤固定在元器件上,上線方式也應(yīng)有序,二次線不能遮住元器件一次接線樁頭,應(yīng)考慮到配件本身的發(fā)熱及檢修拆換方便。6.31.二次線在敷設(shè)途中如遇有金屬障礙時(shí),應(yīng)加以彎曲越過,中間保持4mm以上的距離。

  6.25. In general, wires are not allowed to be bent into many spring like circles for wiring, except for connecting wires with movable contacts between grounding wires and components. The number of turns for grounding wires and connecting wires with movable contacts is limited to 5, as shown in the following figure: 6.26. The connection between the component's lead wire and the wire must be equipped with terminal blocks or small wire transition terminals, and direct overlap is not allowed. 6.27. If the wire is too short during wiring, it must be replaced and it is not allowed to lengthen the wire. 6.28. All wiring terminals on the product should be labeled or fitted with marking sleeves (circuit numbers) according to the requirements of the wiring diagram. 6.29. For products with grounding busbars, each transformer must have a grounding wire connected to the grounding busbar, and for other products, after connecting the transformers, a grounding wire must be connected to the grounding screw. 6.30. When connecting the secondary wire to the component pile head, the wire should not be firmly attached to the component or fixed on the component with suction cups. The wiring method should also be orderly, and the secondary wire should not cover the primary wiring pile head of the component. Consideration should be given to the heating of the accessories themselves and the convenience of maintenance and replacement. 6.31. If there is a metal obstacle during the laying of the secondary line, it should be bent and crossed, with a distance of at least 4mm in between.

  7、線頭制作及配件上線工藝要求線頭制作:即對線頭彎圓或冷壓銅制接線端頭。7.1.線頭制作時(shí)不能使導(dǎo)線的線芯和絕緣層受到損傷。7.2.剝線鉗刃口應(yīng)與線徑相匹配。7.3.壓線鉗的選擇不同的端頭應(yīng)分別采用相適應(yīng)的專用冷壓接鉗。a)預(yù)絕緣端頭壓線鉗口見圖1所示。b)裸端頭壓線鉗口見圖2所示。c)管形預(yù)絕緣端頭壓線鉗口見圖3所示。e)觸針式端頭壓線鉗口見圖4所示。7.4.線芯與端頭配合a)預(yù)絕緣端頭與導(dǎo)線的冷壓接后尺寸見圖5。b)管形預(yù)絕緣端頭與導(dǎo)線的冷壓后尺寸見圖6。c)裸端頭與導(dǎo)線的冷壓接后尺寸見圖7。d)觸針式端頭與導(dǎo)線冷壓接后的尺寸見圖87.5.對單芯導(dǎo)線線頭一般采用尖咀鉗或圓頭鉗進(jìn)行彎成單眼圈,彎圈后的導(dǎo)線其線芯不允許受到損傷,圓圈應(yīng)基本成圓形且其內(nèi)徑應(yīng)比電器接點(diǎn)螺栓直徑大0.5~1mm,羊眼圈末端距導(dǎo)線絕緣應(yīng)有2~4mm距離,保證裝入接點(diǎn)時(shí)墊圈不壓著導(dǎo)線絕緣,導(dǎo)線接入接點(diǎn)后,從垂直方向看去不得有線芯彎成的羊眼圈露出;單眼圈呈順時(shí)針接入螺釘。7.6.工藝要求a)端子的接線均應(yīng)采用冷壓接端頭,線芯直接接于電器接線端子只有該接線端子適應(yīng)于這種方法才能允許。b)預(yù)絕緣端頭壓接后,絕緣部分不能出現(xiàn)破損或開裂。c)導(dǎo)線芯插入冷壓接端頭后,不能有末插入的線芯或線芯露出端子管外部以及絞線的現(xiàn)象,更不能剪斷線芯。(見圖所示)d)冷壓接端頭的規(guī)格必須與所接入的導(dǎo)線直徑相吻合,導(dǎo)線與冷壓接端頭的配合見本守則的規(guī)定。e)剝?nèi)?dǎo)線絕緣層后,應(yīng)盡快與冷壓接端頭壓接,避免線芯產(chǎn)生氧化膜或粘有油污。f)壓接后導(dǎo)線與端頭的抗拉強(qiáng)度應(yīng)不低于導(dǎo)體本身抗拉強(qiáng)度的60%。不同端頭與導(dǎo)線壓接拉力負(fù)荷值見表。端頭規(guī)格與端頭配合的導(dǎo)線截面積mm2拉力負(fù)荷值,NN預(yù)絕緣端頭裸端頭0.5.50.5.560751.0.00.75.7590120

  7. Wire head production and accessories online process requirements: Wire head production: that is, bending the wire head into a circle or cold pressing copper terminal head. 7.1. During the production of wire ends, the core and insulation layer of the wire must not be damaged. 7.2. The cutting edge of the wire stripping pliers should match the wire diameter. 7.3. The selection of crimping pliers should use specialized cold crimping pliers that are suitable for different ends. a) The pre insulated end crimping clamp is shown in Figure 1. b) The bare end crimping jaws are shown in Figure 2. c) The clamping jaws for the pre insulated end of the tube are shown in Figure 3. e) The needle type end crimping jaws are shown in Figure 4. 7.4. Core and Terminal Coordination a) The dimensions of the pre insulated terminal and the wire after cold crimping are shown in Figure 5. b) The dimensions of the pre insulated end of the tube and the wire after cold pressing are shown in Figure 6. c) The dimensions of the bare end and wire after cold crimping are shown in Figure 7. d) The dimensions of the contact pin end and the wire after cold crimping are shown in Figure 87.5. For single core wire ends, sharp pliers or round pliers are generally used to bend them into a single eye circle. The wire core of the bent wire should not be damaged. The circle should be basically circular and its inner diameter should be 0.5-1mm larger than the diameter of the electrical contact bolt. The end of the eye circle should be 2-4mm away from the wire insulation to ensure that the gasket does not press the wire insulation when installing the contact. After the wire is connected to the contact, the eye circle formed by the wire core bending should not be exposed when viewed from the vertical direction; The single eye socket is connected clockwise with screws. 7.6. Process requirements: a) Cold crimping terminals should be used for terminal wiring, and the wire core should be directly connected to the electrical terminal. Only when the terminal is suitable for this method can it be allowed. b) After crimping the pre insulated end, the insulation part should not be damaged or cracked. c) After inserting the wire core into the cold crimping end, there should be no un inserted wire core or wire core exposed outside the terminal tube or stranded wire, and the wire core should not be cut. (As shown in the figure) d) The specifications of the cold crimping terminal must match the diameter of the connected wire, and the coordination between the wire and the cold crimping terminal is specified in this code of practice. e) After stripping the insulation layer of the wire, it should be crimped with the cold crimping end as soon as possible to avoid the formation of oxide film or oil stains on the wire core. f) The tensile strength of the wire and end after crimping should not be less than 60% of the tensile strength of the conductor itself. The load values of the crimping tension between different ends and wires are shown in the table. Terminal specifications and cross-sectional area of the wire that matches the terminal in mm2 tensile load value, NN pre insulated terminal bare end 0.5.50.560751.000.75.7590120

  11001601.5.51.5.51402202.5.52.5.51903204.0.042755006.0.06360630g)針形端頭、片形端頭和管形端頭長度,應(yīng)根據(jù)所接入的端子情況,接觸長度應(yīng)與端子相一致或少長出壓線螺釘;二個(gè)壓線螺釘時(shí)(如電度表),其端頭長度應(yīng)保證二個(gè)螺釘均接觸固定。(見圖所示)?h)觸針式端頭j)通常不允許二根導(dǎo)線接入一個(gè)冷壓接端頭,因接線端子限制必須采用時(shí),宜先采用二根導(dǎo)線壓接的專用端頭,否則宜選用大一級或大二級的冷壓接端頭。預(yù)絕緣端頭與二根導(dǎo)線壓接配合仍應(yīng)符合要求,避免出現(xiàn)裸線芯露出絕緣管外的情況。(見圖所示)k)一個(gè)接線端子接入二個(gè)冷壓接端頭時(shí),應(yīng)根據(jù)不同的端子接線形式,選擇適合的冷壓接端頭。①螺釘串插式平板連接宜采用圓形和叉形端頭(見圖a所示)。允許兩種不同的端頭同時(shí)使用,且允許不同大小線徑的冷壓接端頭接線,此時(shí)大線徑在下面,小線徑在上面。連接時(shí)兩端頭采用背靠背的形式,相疊或張開相互夾角不小于30?(見圖b所示)。②螺釘串插式弧形板連接宜采用針形端頭或管形端頭,也可采用圓形端頭。采用兩個(gè)針形或管形端頭時(shí),線徑或端頭大小應(yīng)相同(見圖a所示)。③平板壓接式連接宜采用片形端頭。(見圖b所示④弧形板壓接式連接宜采用針形和管形端頭。但線徑或端頭大小應(yīng)相同。(見圖c所示)7.7.對多芯導(dǎo)線線徑剝頭后,應(yīng)在導(dǎo)線端部壓上冷壓接端頭,具體做法是:用剝線鉗剝?nèi)?~7mm長的塑料皮,并將號碼管套上,打開冷壓鉗,將冷壓鉗端子標(biāo)記向上,放入冷壓鉗相應(yīng)的鉗口處,把導(dǎo)線插入冷壓端子內(nèi),然后進(jìn)行壓接,必需加壓鉗口完全閉合方可放開,并達(dá)到如下要求:1)壓接冷壓接端頭時(shí),線芯頂端應(yīng)露出插套0.5~1mm,不帶絕緣護(hù)套的壓接端頭,導(dǎo)線絕緣層與插套之間的過渡間隙應(yīng)控制在0.5mm范圍內(nèi)。2)冷壓鉗錐口的中心應(yīng)對準(zhǔn)冷壓接端頭插套焊縫中心,壓痕在無焊縫處。7.8.低壓抽屜柜接線頭一律采用冷壓端子。7.9.同一電器單位應(yīng)用同一種導(dǎo)線端頭制作方法。7.10.冷壓接端頭的選用,應(yīng)根據(jù)元器件上接線端頭的型式不同而不同:當(dāng)電接點(diǎn)兩邊沒有擋板時(shí)必需選用TO型冷壓如接地線樁頭、電線與母排的連接處、CT、PT及大部分儀表上,樣式見圖:?7.11.冷壓接端頭的規(guī)格應(yīng)根據(jù)導(dǎo)線的截面積或設(shè)計(jì)要求進(jìn)行選用,具體見下表1:7.12.剝線的長度應(yīng)按電器元件接線板上螺釘?shù)闹睆絹泶_定如表2所示:螺釘直徑(mm)34568剝線長度(mm)

  11001601.5.51.5.51402202.5.52.5.5519032040.0.042755006.0.06360630g) The length of needle shaped end, sheet shaped end, and tube shaped end should be consistent with the terminal or at least extend the crimping screw according to the condition of the connected terminal; When using two crimping screws (such as an electricity meter), the length of the end should ensure that both screws are in contact and fixed. (As shown in the picture)? h) Pin type terminals (j) usually do not allow two wires to be connected to one cold crimping terminal. When it is necessary to use terminals due to limitations, it is advisable to first use a dedicated terminal for crimping two wires. Otherwise, it is recommended to use a cold crimping terminal that is one or two levels larger. The pre insulated end should still meet the requirements for crimping with two wires to avoid the situation where the bare wire core is exposed outside the insulation tube. When one terminal is connected to two cold crimping terminals (as shown in the figure), the appropriate cold crimping terminal should be selected according to the different terminal connection forms. ① Screw string insertion flat plate connections should use circular and fork shaped ends (as shown in Figure a). Allow two different types of terminals to be used simultaneously, and allow cold crimping terminals of different sizes to be connected, with the larger wire diameter at the bottom and the smaller wire diameter at the top. When connecting, the two ends should be in a back-to-back form, with an angle of no less than 30 degrees between each other when overlapping or opening? (As shown in Figure b). ② The screw string insertion arc-shaped plate connection should use needle shaped or tube shaped ends, and circular ends can also be used. When using two needle or tube shaped ends, the wire diameter or end size should be the same (as shown in Figure a). ③ Flat press fit connections should use sheet shaped ends. (As shown in Figure b, it is recommended to use needle shaped and tube shaped ends for the arc-shaped plate crimping connection.). But the wire diameter or end size should be the same. 7.7. After stripping the diameter of the multi-core wire, a cold crimping end should be pressed onto the wire end. The specific method is to use wire stripping pliers to strip off the 5-7mm long plastic skin, and cover the number tube. Open the cold crimping pliers, mark the terminal of the cold crimping pliers upwards, place it in the corresponding clamp of the cold crimping pliers, insert the wire into the cold crimping terminal, and then perform crimping. It is necessary to apply pressure until the clamp is completely closed before releasing it, and meet the following requirements: 1) When crimping the cold crimping end, the top of the wire core should be exposed 0.5-1mm from the socket, and the crimping end without insulation sheath should have a transition gap between the wire insulation layer and the socket. It should be controlled within a range of 0.5mm. 2) The center of the cold press clamp cone should be aligned with the center of the cold press joint end socket weld, and the indentation should be made at the location without weld. 7.8. Cold pressed terminals shall be used for all wiring heads of low-voltage drawer cabinets. 7.9. The same electrical unit should use the same method for making wire ends. 7.10. The selection of cold crimping terminals should vary depending on the type of terminals on the components: when there are no baffles on both sides of the electrical contact, TO type cold crimping must be selected, such as grounding wire pile heads, wire and busbar connections, CT, PT, and most instruments. The style is shown in the figure:? 7.11. The specifications of cold crimping terminals should be selected according to the cross-sectional area of the wire or design requirements, as shown in Table 1: 7.12. The length of wire stripping should be determined according to the diameter of the screw on the electrical component wiring board, as shown in Table 2: screw diameter (mm) 34568 wire stripping length (mm)

  TUTO型冷壓頭規(guī)格尺寸7.13.元器件的接線方式有:a)直接接入法b)焊接型接法c)螺釘壓接型接法 d)插接型接法⑴直接接入法:如電度表及抽屜式二次插件上用瓦型墊圈壓接的接線方式,用瓦型墊圈壓接接線線頭制作應(yīng)達(dá)到如下要求:1)用瓦型墊圈壓接的導(dǎo)線,導(dǎo)線的線芯應(yīng)露出瓦型墊圈0.5~1.0mm。2)接入一根導(dǎo)線時(shí),導(dǎo)線應(yīng)順螺釘旋緊方向插入。3)兩根接入瓦型墊圈接線端的導(dǎo)線,線徑不相同時(shí),其中線徑細(xì)的單芯導(dǎo)線可將導(dǎo)線線芯彎曲180度后再插入,如下圖,多芯導(dǎo)線須用冷壓接頭。⑵焊接型接線原則:1)焊接型接線端要求焊點(diǎn)光亮、牢固,不允許出現(xiàn)虛焊、漏焊。2)導(dǎo)線元器件上的焊接處在焊接前應(yīng)其表面氧化層,并進(jìn)行搪錫處理。3)焊接時(shí)可以用少量松香或少量中性助焊劑,不允許使用酸性助焊劑進(jìn)行焊接。4)焊接完畢后,焊點(diǎn)應(yīng)當(dāng)用灑精棉擦試清潔。5)焊接時(shí)應(yīng)注意保護(hù)導(dǎo)線的絕緣層不被燙傷,或產(chǎn)生明顯的熱收縮現(xiàn)象。⑶螺釘壓接型接線:即用螺釘壓接彎圓導(dǎo)線或壓接TO TU型壓接端頭的多芯導(dǎo)線接線原則:1)被壓接的彎圓型導(dǎo)線,導(dǎo)線的彎圓方向應(yīng)與螺釘?shù)男o方向相一致,方向不允許逆轉(zhuǎn)。2)兩根彎圓導(dǎo)線接入接線端時(shí),彎圓導(dǎo)線之間必須墊入與螺釘相應(yīng)的銅質(zhì)平墊圈,并且導(dǎo)線規(guī)格不同時(shí),應(yīng)將截面積大的導(dǎo)線放在接線端底部。3)彎圓導(dǎo)線接入接線端時(shí),導(dǎo)線的絕緣層不允許被平墊壓住,兩根TO、TU型壓接端頭的導(dǎo)線應(yīng)“背對背”接入接線端。4)二次線接母排上時(shí),必須在排上打孔,2.5mm2以下的導(dǎo)線用M5螺釘孔,4mm2以上的用M6螺釘連接,一個(gè)孔允許接2根線,該孔另一面不允許再接線。二次線不允許從母排相間穿過。5)一般電流電壓互感器及部分儀表以及抽屜式斷路器的次插件樁頭大多無彈墊,上線后易松。⑷插接型接線在線芯上插接插針型冷壓銅接端頭后,用適當(dāng)工具壓接牢固,再插接在元器件相應(yīng)的插接片上,插接后不得有松動(dòng)現(xiàn)象。

  The specifications and dimensions of the TUTO type cold press head are 7.13. The wiring methods for components include: a) direct connection method, b) welding connection method, c) screw compression connection method, d) plug-in connection method. (1) direct connection method: for example, the wiring method of crimping with a tile washer on an electricity meter and a drawer type secondary plug, the wire head made by crimping with a tile washer should meet the following requirements: 1) For wires crimped with a tile washer, the wire core of the wire should protrude 0.5-1.0mm from the tile washer. 2) When connecting a wire, the wire should be inserted in the direction of tightening the screw. 3) When two wires with different diameters are connected to the tile shaped gasket terminal, the single core wire with a thinner diameter can be bent 180 degrees and then inserted, as shown in the figure below. Multi core wires require cold pressed joints. ⑵ Welding type wiring principle: 1) Welding type wiring terminals require bright and firm welding points, and no virtual welding or leakage is allowed. 2) Before welding, the surface oxide layer of the solder joints on the wire components should be removed and treated with tin coating. 3) A small amount of rosin or neutral flux can be used during welding, and acidic flux is not allowed for welding. 4) After welding, the welding points should be wiped clean with a cotton swab. 5) During welding, attention should be paid to protecting the insulation layer of the wire from burns or significant thermal shrinkage. ⑶ Screw crimping type wiring: that is, using screws to crimp bent round wires or TO TU type crimping terminals for multi-core wire wiring principles: 1) The bending direction of the crimped bent round wire should be consistent with the tightening direction of the screw, and the direction should not be reversed. 2) When two bent round wires are connected to the terminal, copper flat washers corresponding to the screws must be inserted between the bent round wires, and when the wire specifications are different, the wire with a larger cross-sectional area should be placed at the bottom of the terminal. 3) When a bent round wire is connected to the terminal, the insulation layer of the wire is not allowed to be pressed down by a flat pad. The wires of the two TO and TU type crimping terminals should be connected back to back to the terminal. 4) When connecting the secondary wire to the busbar, holes must be drilled on the busbar. For wires with a diameter of less than 2.5mm2, M5 screw holes should be used, and for wires with a diameter of more than 4mm2, M6 screws should be used for connection. Two wires are allowed to be connected to one hole, but no further wiring is allowed on the other side of the hole. Secondary lines are not allowed to pass through the busbar alternately. 5) The secondary plug heads of general current and voltage transformers, some instruments, and drawer type circuit breakers mostly have no spring pads and are prone to loosening after being put online. ⑷ Plug in type wiring: After inserting the pin type cold pressed copper terminal on the wire core, use appropriate tools to press it firmly, and then plug it into the corresponding socket of the component. There should be no looseness after insertion.

  7.14.樁頭上線的工藝要求⑴一般情況每個(gè)接線端點(diǎn)只允許連接一根導(dǎo)線接頭多允許連接二根導(dǎo)線,并在導(dǎo)線壓接端頭的上下側(cè)均應(yīng)配有平墊圈,導(dǎo)線壓接端頭必須可靠推入且螺絲需擰緊不得有松動(dòng)現(xiàn)象,對未接線的緊固件在完工時(shí)應(yīng)逐個(gè)擰緊避免松動(dòng)脫落,螺釘端頭伸出螺母應(yīng)符合露出(2~5牙)的標(biāo)準(zhǔn)。⑵連接元器件上的接線頭必須彎成賀弧形,有利于檢修,線也不易損傷。同一臺同一類電器或同種方案的幾臺巨子元件接線后所彎成的圓弧大小和高度應(yīng)統(tǒng)一。⑶凡是直流電流表須配有分流器時(shí),其二次接線應(yīng)直接連接,不得經(jīng)過端子板,當(dāng)線徑為1.5平方時(shí)其長度不得超過3m。⑷連接到發(fā)熱元件(如管形電阻,板形電阻,瓷盤電阻)上的導(dǎo)線,應(yīng)從其側(cè)方或下方引出,離發(fā)熱元件30mm以上,當(dāng)接入小于或等于15W管形電阻時(shí)應(yīng)剝?nèi)?dǎo)線絕緣層20mm左右長度,接入大于15W管形電阻時(shí)應(yīng)剝?nèi)?dǎo)線絕緣約40mm。然后套上耐熱瓷珠,再進(jìn)行連接,焊接處應(yīng)牢固無虛焊、漏焊。⑸對于小于75W的管形電阻允許用螺桿串心后一頭固定在骨架或支架上。對大于75W的管形電阻應(yīng)用螺桿串心后二頭固定后才能接線。對時(shí)間繼電器上的附加電阻不能懸掛焊接,應(yīng)固定在面板支件上。⑹導(dǎo)線接到電器元件接線端頭時(shí),導(dǎo)線不允許把元件上的接線端頭遮住,應(yīng)方便拆裝。

  7.14. Process requirements for the installation of pile heads (1) Generally, only one wire is allowed to be connected to each wiring endpoint, and a maximum of two wires are allowed to be connected to the joint. Flat washers should be provided on both the upper and lower sides of the wire crimping end. The wire crimping end must be reliably pushed in and the screws must be tightened without loosening. Unwired fasteners should be tightened one by one upon completion to avoid loosening and falling off. The protruding nut of the screw end should meet the standard of exposing (2-5 teeth). The connectors on the connected components must be bent into a curved shape, which is conducive to maintenance and the wires are not easily damaged. The size and height of the arc formed by connecting several giant components of the same type or scheme should be uniform. When a DC ammeter needs to be equipped with a shunt, the secondary wiring should be directly connected and not pass through the terminal board. When the wire diameter is 1.5 square meters, its length should not exceed 3 meters. The wire connected to the heating element (such as tube shaped resistor, plate shaped resistor, porcelain plate resistor) should be led out from its side or below, at least 30mm away from the heating element. When connecting a tube shaped resistor less than or equal to 15W, the insulation layer of the wire should be stripped off by about 20mm, and when connecting a tube shaped resistor greater than 15W, the insulation of the wire should be stripped off by about 40mm. Then, heat-resistant ceramic beads should be placed on it before connection, and the welding should be firm without virtual welding or leakage. ⑸ For tubular resistors less than 75W, it is allowed to fix one end of the screw after threading on the skeleton or bracket. For tubular resistors with a power greater than 75W, the screw should be threaded and fixed at both ends before wiring. The additional resistor on the time relay cannot be suspended and welded, but should be fixed on the panel support. When connecting the wire to the terminal of an electrical component, the wire should not cover the terminal of the component and should be easy to disassemble and assemble.

  8、二次行線部分示例及符號牌形式8.1.端子排的配線心⑴導(dǎo)線接入端子前應(yīng)做成圓弧形狀4其圓弧半徑不小于10mm,圓弧跨度長視標(biāo)記套管長度而定。(見圖a)⑵導(dǎo)線接入端子排前的分線:1)導(dǎo)線從上往下接入端子排。(見圖b)(見圖c)2)導(dǎo)線從下往上接入端子排。3)導(dǎo)線從端子排中間分別向上、下方向接入端子排。(見圖c)4)插銷式扎帶捆扎方式導(dǎo)線接入端子排,分線前應(yīng)捆扎,一次多分3根導(dǎo)線或分出接入3只端子排距離的導(dǎo)線。(見圖e)5)卷式結(jié)束保護(hù)帶包扎方式導(dǎo)線接入端子排,應(yīng)按接入端子排的導(dǎo)線順序,相對于接線端子位置,逐漸分出。(見圖f)6)行線槽方式導(dǎo)線接入端子排,行線槽與端子排的安裝距離應(yīng)為40mm~60mm之間,導(dǎo)線相對于接線端子位置從行線槽出線孔逐漸分出;行線槽孔距應(yīng)選擇與端子板厚度相同,導(dǎo)線分出平直,高度一致。(見圖d)8.2.電器元件端子的配線⑴導(dǎo)線接入端子前應(yīng)做成圓弧形狀,其圓弧半徑不小于10mm,跨度長視標(biāo)記套管長度而定。(見圖a)⑵導(dǎo)線距離端子接線管端部的彎曲應(yīng)符合規(guī)定要求,因裝配限制接線端頭必需彎曲時(shí),只允許彎曲一次,且折彎角度不得大于45°。(見圖b)⑶LA、AD11型按鈕、信號燈配線見圖c所示,⑷LW5型轉(zhuǎn)換開關(guān)配線見圖d所示,導(dǎo)線跨度不應(yīng)大于120mm。⑸LW12型轉(zhuǎn)換開關(guān)配線見圖e所示,導(dǎo)線跨度不應(yīng)大于120mm。⑹LW2型轉(zhuǎn)換開關(guān)配線見圖f所示,導(dǎo)線跨度不應(yīng)大于150mm和90mm。⑺42L6儀表配線見圖g所示,導(dǎo)線彎曲跨度不應(yīng)超過儀表邊緣。⑻6L2儀表配線見圖h所示,導(dǎo)線超出儀表上部邊緣不大于6mm,左右與邊緣平齊。?⑼繼電器的配線見圖i所示。⑽電器接線端子位于并突出于電器中間段的配線見圖所示,導(dǎo)線與電器面的角度不大于30°。⑾儀表門的配線(見圖k所示)各電器元件配線方向應(yīng)從導(dǎo)線束敷設(shè)相反的方向彎繞各電器元件的安裝應(yīng)端正,導(dǎo)線敷設(shè)應(yīng)盡量采用集中線束的方法。8.3.其他⑴二次電源線接線:──采用專用接線端頭,二次電源線用冷壓扁平快速端頭與之連接。(見圖I)──在母排上開4的孔或直接攻絲,采用M4螺釘連接。──導(dǎo)線長度應(yīng)留有適當(dāng)?shù)脑A浚⑵渚沓陕菪螤盥菪蝺?nèi)徑約8mm~10mm,繞3~5圈。(見圖m)8.4.保護(hù)接地⑴標(biāo)志和識別a)保護(hù)接地端子應(yīng)采用顏色標(biāo)志(黃-綠雙色的標(biāo)志)b)文字符號采用PE識別。圖形符號見圖n、圖O優(yōu)先選用圖O⑵接地保護(hù)的范圍a)所有作為隔離帶電導(dǎo)體的金屬隔板均應(yīng)有效地接地。石形笑設(shè)備的框架、儀用變壓器的金屬外殼、開關(guān)電器、儀繼電器的金屬外殼以及金屬手動(dòng)操作機(jī)構(gòu)均應(yīng)有效接c) 對于門、蓋板、覆板和類似部件,如果其上沒有安裝電氣設(shè)備則一般金屬螺釘連接或鍍鋅的金屬絞鏈連接就認(rèn)為保證了電的連續(xù)性:如果其上裝有額定電壓值超過42V的電氣設(shè)備時(shí),應(yīng)采用保護(hù)導(dǎo)體將這些部件和保護(hù)電路連接。8.5.二次行線部分示例及符號牌形式⑴分路部分接入單排儀表的線束布置示例:⑵分路部分到雙排儀表的線束,可用中間分線的布置⑶分路部分到按鈕,熔斷器,控制開關(guān)等部件的線束布置原則上按橫向?qū)ΨQ行走,如果受到位置上的限制,允許緊問對稱行走,所有接線應(yīng)有一定拋度,其拋度高為20mm左右。信號燈或按鈕雙排及雙排以上布置接線⑷分路部分到繼電器的線束,一律按水平居中向兩側(cè)分開的方向行走。到繼電器接線端的每根線應(yīng)略帶圓弧狀連接般圓弧如圖,力求同面板上的各種繼電保護(hù)回路圓弧──?⑸符號牌形式及編寫方法見下附圖,符號牌橫線上方編寫元件安裝序號如:1、1;橫線下方編寫元件符號。接線圖上有設(shè)計(jì)標(biāo)志時(shí)按圖紙要求編號。

  8. Example and symbol plate form of secondary wiring section 8.1. Wiring center of terminal block (1) The wire should be made into a circular arc shape before being connected to the terminal. The radius of the circular arc should not be less than 10mm, and the span length of the circular arc depends on the length of the marked sleeve. (See Figure a) ⑵ Wire distribution before connecting to the terminal block: 1) The wire is connected to the terminal block from top to bottom. (See Figure b) (See Figure c) 2) Connect the wire from bottom to top into the terminal block. 3) The wires are connected to the terminal block in both upward and downward directions from the middle of the terminal block. (See Figure c) 4) Pin type zip tie binding method: When connecting wires to terminal blocks, they should be tied before splitting. A maximum of 3 wires can be split at a time or wires that are separated and connected to a distance of 3 terminal blocks can be added. (See Figure e) 5) The wrapping method of the rolled end protective tape should gradually separate the wires connected to the terminal block in the order of the wires connected to the terminal block, relative to the position of the terminal block. (See Figure f) 6) The wire is connected to the terminal block through the wire slot method, and the installation distance between the wire slot and the terminal block should be between 40mm and 60mm. The wire gradually branches out from the wire slot outlet hole relative to the wiring terminal position; The distance between the wire slot holes should be selected to be the same as the thickness of the terminal board, with straight wire branches and consistent height. (See Figure d) 8.2. Wiring of Electrical Component Terminals (1) Before connecting the wire to the terminal, it should be made into a circular arc shape with a radius of not less than 10mm, and the span length depends on the length of the marked sleeve. (See Figure a) ⑵ The bending of the wire from the end of the terminal conduit should meet the specified requirements. Due to assembly limitations, when the terminal must be bent, only one bending is allowed, and the bending angle should not exceed 45 °. (See Figure b) ⑶ The wiring of LA and AD11 buttons and signal lights is shown in Figure c, (4) The wiring of LW5 type conversion switch is shown in Figure d, and the wire span should not exceed 120mm. (5) The wiring of LW12 type conversion switch is shown in Figure e, and the wire span should not exceed 120mm. (6) The wiring of LW2 type conversion switch is shown in Figure f, and the wire span should not exceed 150mm and 90mm. (7) The wiring of 42L6 instrument is shown in Figure g, and the wire bending span should not exceed the edge of the instrument. The wiring of the 6L2 instrument is shown in Figure h. The wire should extend no more than 6mm beyond the upper edge of the instrument and be level with the edge on both sides.? The wiring of the relay is shown in Figure i. The wiring of the electrical wiring terminal located in and protruding from the middle section of the electrical appliance is shown in the diagram, and the angle between the wire and the electrical surface is not greater than 30 °. The wiring direction of each electrical component in the instrument door (as shown in Figure k) should be bent in the opposite direction of the wire harness. The installation of each electrical component should be upright, and the wire harness should be laid in a centralized manner as much as possible. 8.3. Other (1) Secondary power cord wiring: - Use dedicated wiring terminals, and connect the secondary power cord to it with cold pressed flat quick connectors. (See Figure I) - Drill 4 holes or directly tap on the busbar, and use M4 screws for connection. The length of the wire should have an appropriate margin, and it should be coiled into a spiral shape with an inner diameter of about 8mm to 10mm, and wound 3 to 5 times. (See Figure m) 8.4. Protective Grounding ⑴ Marking and Identification a) Protective grounding terminals should use color markings (yellow green dual color markings) b) Text symbols should be identified by PE. The graphic symbols are shown in Figure n and Figure O, and Figure O (2) is preferred for the range of grounding protection. (a) All metal partitions used as isolated live conductors should be effectively grounded. The frame of the Shixingxiao equipment, the metal casing of the instrument transformer, the metal casing of the switchgear, the metal casing of the instrument relay, and the metal manual operating mechanism should all be effectively connected. c) For doors, cover plates, cladding, and similar components, if no electrical equipment is installed on them, metal screw connections or galvanized metal hinge connections are generally considered to ensure electrical continuity. If electrical equipment with a rated voltage exceeding 42V is installed on them, protective conductors should be used to connect these components to the protective circuit. 8.5. Examples of Secondary Wiring Parts and Symbol Plate Forms: (1) Wiring Harness Layout Example for Branch Connection to Single Row Instruments: (2) Wiring Harness from Branch Connection to Double Row Instruments can be arranged with a middle branch line. (3) Wiring Harness Layout from Branch Connection to Buttons, Fuses, Control Switches, and Other Components should be arranged symmetrically in the horizontal direction. If restricted by position, it is allowed to walk symmetrically. All wiring should have a certain degree of throw, with a throw height of about 20mm. The wiring of signal lights or buttons should be arranged in double rows or more. The wiring harness from the branching part to the relay should be horizontally centered and move in a direction separated from both sides. Each wire to the relay terminal should have a slightly curved connection as shown in the diagram, striving to match the various relay protection circuit arcs on the panel? The form and writing method of the symbol board are shown in the attached figure. The component installation number is written above the horizontal line of the symbol board, such as: 1, 1; Write component symbols below the horizontal line. When there are design symbols on the wiring diagram, they should be numbered according to the requirements of the drawing.

  9、檢驗(yàn)規(guī)則⑴接線完工后一定要打掃柜內(nèi)與周圍的雜物,進(jìn)行自檢。⑵接線頭螺釘有無松動(dòng)現(xiàn)象,如有松動(dòng),即加以緊固。⑶所行線路要平、直、齊、牢。⑷所有元件不接線的端子,都需配齊螺釘、螺母、墊圈等并要求緊固。⑸按技術(shù)要求的各項(xiàng)規(guī)定,進(jìn)行元件規(guī)格的外觀檢查,并符合圖紙要求。⑹核對導(dǎo)線選用規(guī)格是否正確,導(dǎo)線絕緣層及導(dǎo)體有無損傷。⑺檢查扎線質(zhì)量、彎曲半徑是否符合要求,方向是否正確。⑻檢查此次回路的電氣間隙、爬電距離、距離是否符合規(guī)定要求。⑼按原理接線圖及施工接線圖,檢查導(dǎo)線連接是否正確。⑽按有關(guān)技術(shù)條件和標(biāo)準(zhǔn),進(jìn)行出廠檢試。

  9. Inspection rule ⑴ After the wiring is completed, it is necessary to clean the cabinet and surrounding debris for self inspection. Check for any looseness in the wiring head screws. If there is any looseness, tighten them. The route should be flat, straight, even, and secure. All components without wiring terminals must be equipped with screws, nuts, washers, etc. and tightened. According to the technical requirements, conduct a visual inspection of the component specifications and ensure compliance with the drawing requirements. ⑹ Check whether the specifications of the selected wires are correct, and whether the insulation layer and conductor of the wires are damaged. Check the quality of the cable tie, whether the bending radius meets the requirements, and whether the direction is correct. Check whether the electrical clearance, creepage distance, and safety distance of this circuit meet the specified requirements. According to the principle wiring diagram and construction wiring diagram, check whether the wire connections are correct. Conduct factory inspection according to relevant technical conditions and standards.

  本文由 濟(jì)南機(jī)箱機(jī)柜  友情奉獻(xiàn).更多有關(guān)的知識請點(diǎn)擊  http://bjfrp.com/   真誠的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識我們將會陸續(xù)向大家奉獻(xiàn).敬請期待.

  This article is a friendly contribution from Jinan Chassis Cabinet For more related knowledge, please click http://bjfrp.com/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

首頁首頁 產(chǎn)品產(chǎn)品 電話電話 置頂置頂
免费在线a| 丁香五月在线自慰| 欧美性二区| 综合狠狠五月婷婷| 99视频精品全部观看10| 丁香婷婷啪啪| 老妇六区| 亚洲一区国产传媒| 99热日本| 大地资源中文第3页| 成人丁香| 婷婷丁香六月天激情四射网| www婷婷| 五月婷婷久久激情| 成人丁香五月天| 丁香色色色| 激情五月丁香五月色| 亚洲精品视频电影| 色婷婷国色天香综合| 激情深爱五月| 泰州成人视频| 99人人干人人操| 丁香五月1页| 五月草影视| 婷婷五月综合色拍| 成人在线观看精品| 97视频.干com| 天天综合永久| 成人网在线视频| 欧美日本韩国亚洲| 五月天丁香婷| 五月婷婷伊人久久| 开心激情网在线| 色五月噜噜| 亚洲激情在线| 六月丁香激情网| 婷婷六月色| www.ywav| 五月天婷五月天综合网小说首页-五月天激激婷婷大综合,婷婷亚洲综合五月天小说 | 午夜在线成人网站免费观看| 天天开心天天色| 色色综合色| 开心五月婷婷激情| 人操人| 激情五月黄色小说| 美国十月色婷婷在线观看| 少妇大叫太大太粗太爽了A片| 97婷婷在线| 337p午夜影院| 超碰免费大香蕉| 狠狠婷婷综合| 久热久色| 六月激情网| 中文字幕在线免费看线人| 超碰高清在线| 激情小说之五月| 碰超99| 中文字幕人妻AV| 亚洲激情电影五月天色婷婷丁香一起草| 婷婷五月成人| 色五月 婷婷, 大香蕉| 色啪影院| 狠狠狠色激情综合适合| 成人丁香婷婷| 秋霞午夜理论| 综合大香蕉| 色婷婷综合在线| 五月天婷婷网站| 婷婷五月天综合网| 91疯狂操操操操| 五月成人网天天| 久久久噜噜噜久久人妻| 成片免费观看视频大全| 丁香六月综合激情| 激情玖玖综合网| 久久黄色免费视频| 五月婷婷亚洲| 亚洲人妻电影| 婷婷社区五月天| 欧美三级巜人妻互换| 综合久久97| 啪啪亚洲综合| 99热个人在线| 少妇丁香婷婷| 久久人人超| 午夜九九九九九九| 欧美激情丁香五月天久久婷婷一区| 国产丝袜美女| 婷婷五月丁香激情图片| 婷婷热婷婷色| 九九色婷婷| 懂色av蜜臀av粉嫩av永陈冠希 | 色五月超碰| 色综合射婷婷| 国产成人综合电影| 97人人射| 久久久久亚洲AV成人无码电影| 综合99在线| 五月婷婷综合色拍| 丁香五月影院| 99er精品| www.色色五月天.com| 久久玖玖99| 丁香婷婷六月天| 国产无套精品一区二区| 色吧五月婷婷| 久久久91| 91婷婷丁香五月| www.狠狠艹| 激情久久久| 五月天色狠狠| 久久99热这里只频精品6学生| 91热视频色网站| 婷婷五月激情在线| 99精品视频在线观看| 日本99热| 日日噜噜夜夜狠狠久久丁香六月| 免费国产视频| www,com,五月色色| 六月撸婷婷| www.婷婷五月| 五月天婷婷色色首页| 五月丁香六月婷婷视频| 中字幕视频在线永久在线观看免费 | 五月综合色| 99国产小视频免费观看| 激情亚洲网| 久久五月婷婷电影| 91色久| 丁香五月自拍| 色色色婷婷五月天| 伊人婷婷综合| 亚洲超碰在线| 好好干Av| 亚洲精品久久久无码| 免费精品66| 搡BBBB搡BBB搡18| 久久久婷婷| 欧美成人A片AAA片在线播放 | 欧美,日韩成人在线| 九九久久综合网站| 久久久一级AAA| 婷婷开心青青草| 日产精品一线二线三线芒果| 色婷婷综合五月| 亚洲V国产V欧美V久久久久久| 精品视频这里只有精品| 99色亚洲| 日本色婷婷综合| 精品亚洲国产成AV人片传媒| 丁香五月天殴美激情| 99精品无码| www.五月婷婷久久.com| 三级片AAA久久久AAA久久久AAA | 色五月大香蕉| 99ER热精品视频| 色婷婷丁香五月在线| 久久伊人大香蕉| 日日射天天射| 婷婷综合在线网| www.狠狠艹| 色婷亚洲五月丁香| 综合激情在线| 美女va| 久热99| 99色色热| 极品人妻VIDEOSSS人妻| 亚洲欧美999| 《丁香激情综合久久伊人久久》影视在线观看 -高清预告手机免费播放 -三妹影院 | 欧美人人草草| 99视频在线精品| 丁香五月停停基地| 91超级碰| 丁香久久五月天视频在线观看| 99超超碰| 五月婷婷之综合激情| 啪啪夜久久| 99熟女视频| 色八月婷婷| 五月婷在线观看| 激情丁香网| 日本三级日本黄色| 无套内谢少妇毛片A片流出白浆| 日本一级特黄大片AAAAA级| 人人爱操| 国产精品色一哟哟| 欧美日韩国产伦精品日韩人妻一| 国产熟女一区二区三区五月婷| 激情综合网五月在线播放| 少妇人妻人伦A片| 五月婷六月天| 超碰9| 婷婷色婷婷| 青青草婷婷综合五月| 五月天丁香啪啪啪啪| 91色在线 | 日韩| 色八月婷婷| 性按摩玩人妻HD中文字幕 | 亚洲色综合| 欧洲第一无人区观看| 五月丁香成人版| 日韩天堂久久| 丁香九月婷| 色五月五月天| 六月婷婷九月丁香| 婷婷综合伊人丁香| 色婷婷激情视频| 大香蕉久久| 亚洲成人电影aaaa| 99热色婷婷| 精品久久艹| 婷婷五月丁香综合人妻| 色啪综合| 久久久婷丁香五月| 狠狠干在线| 九九sese| 狠狠综合色网| 裸睡玩奶头(高H)| 人人人舔人人人操人人人摸人人人97 | 天天日天天色| 六月婷婷狠狠| 日韩黄色电影| ..真实国产乱子伦对白在线_欧| 色五月丁香六月欧美综合| 婷婷成人在线| av国产精品| 天天久| 99热免费网站| 国产精品岛国片在线观看免费| 在线播放成人网站| 天天舔天天插天天干| 日韩黄色网络| 五月婷A V在线| a久久| 色婷婷伦理| 久久3p| 婷婷五月天丁香| 丰满少妇熟乱XXXXX视频| 婷婷丁香五月天综合网| 香蕉网久久| 婷婷五月天AV| 99在线精品视频| 婷婷五月天99| 久久最新色色色| 久久一伦| 久久久亚洲精品一区二区三区浴池| 激情婷婷丁香| 色婷婷成人影片| 2016日日夜夜操| 色99在线| 欧美精品99| 五月天堂在线| 婷婷激情丁香五月天综合| 五月天之色情综合网| 久久久天堂国产精品女人| va亚洲中文在线| 人妻久久久久久久久妻久久久久久久久| 99精品久久久久久久久| 婷婷综合网| 生活片五区| 亚洲色婷婷五月| 丁香综合伊人| 久久永久视频| 成人免费超碰| www.久热| 久久久99视频| 欧美黄色AA片哗啦啦啦| 五月丁激情| 91婷婷| 丁香六月婷婷社区| 婷婷五月天久草在线| 日韩视频99| 激情又色又爽又黄的A片| 欧美亚洲操逼| 深爱五月激情网| 69久久99精品久久久久| 日本玖玖在线| 国产又色又爽又黄又免费| 亚洲色夜| 五月天停婷基地| 色婷婷五月天天天干天天操天天爽| 在线观看熟女少妇| 婷婷九月亚洲| 99啪在线视频| 丁香啪啪中文字幕| 久久婷婷青青| 大香蕉手机视频| 婷婷香蕉| 色噜噜狠狠色综合成人网| 深情五月天| 激情五月激情综合网一级丸片| 日本WWW九九九| 日本偷拍九九九| 久久婷婷五月| 国产伦亲子伦亲子视频观看| 99re思思热久久| 七七九色| 特级毛片绝黄A片免费播冫| 国产成人+亚洲+欧洲| 国产热精品| 成人婷婷桔色| 丁香综合伊人| 激情综合五月婷| 另类综合激情| 五月丁香激情综合| 亚洲激情四射| 久久久中文| 99热99精品| 99视频久久久| 亚洲AV免费国产电影| 日韩AV在线电影| 日本视频不卡123区| 79精品视频在线观看,| 激情综合网五月| 五月婷婷综合网| 久久激情五月婷婷| 色婷婷亚洲精品天天综| 五月激情小说网| VfJxEwPH| 色色综合色| 五月丁香狠狠| 婷婷狠狠五月综合| xxx综合在线| 五月丁香激情婷婷综合字幕| 九九这里只这里只有精品| 性五月激情| 色婷婷五月综合| 九九热这里只有精品23| 激情网五夜婷婷| 激情无码五月天| 五月婷婷色播视频| 婷婷五月天国产手机在线视频观看| 精品国产va久久久久| 99er这里只有精品| 亚洲第一色色色色| 五月激情丁香久久综合网| 综合激情五月丁香9999久久精| 色五月激情问网站| www..com色爱| 激情五月天婷婷视频| 天天干天天干天天干天天干天天| 婷婷激情五月综合丁| 不卡影院午夜理论片| 国产淫熟妇| 玖久精品视频9| 亚洲中文乱字字幕线在永久| 狠色色狠网| 国产日韩欧美| 九九性爱网| 色播五月综合网| 亚洲AV综合网| 开心激情网在线| 超pen个人视频97| 丁香五月婷婷激情97| 黄色激情网站在线观看| 丁香激情五月天| 99人妻碰碰碰久久久久| 热99精品视频五月| 日韩人妻在线观看| 人人爱干人人爱草| 桔色成人官方网站| 这里只有精品网| 成人精品亚洲性爱| 国产精品视频| 国产欧美精品AAAAAA片| 五月天激情小说| 五月丁香狠狠爱婷婷综合| 久草九九| 欧美性爱五月天| 婷婷五月综合欧美在线播放| 99热这里只有精品搜| 五月婷婷丁香五月 | 91男女视频在线观看| 香蕉99网| 久久久性爱视频| 日本3级片偷拍网站| 九九国产精视频| 99热这里只有精品96| 婷婷激情五月色综合| 驯服上司人妻HD中字日本| 五月婷婷激情综合| 性爱久久| 久久婷婷夜| 久久婷婷亚洲| 99.色| 激情五月婷| 超碰av在线| 久热只有精品| 激情婷婷五月在线合集| 九九色99| 五月婷婷在线网站| www.夜夜操.com| 五月婷丁香| 超碰日韩成人| 综合狠狠干| 琪琪秋霞| 婷婷狠狠色| 日韩欧美一级大黄网站| 天天综合色| 99情色五月天| 91操操| 伊人狠狠操| 五月天成人在线播放| 激情婷婷六月天| 久久ri精品| 极品色丁香| 五月婷高清视频| 久久国产色| 玖玖精品视频| 91在线人| 亚洲综合网 665566| 亚洲激情视频网| 少妇的肉体AA片免费| 99热国品| 99免费偷拍视频| av在线超清中文| 亚洲a色| 综合网亚洲| 中文字幕av久久爽| 成久综合视频| 亚洲综合色网| wwwss在线观看| 国产精品日日躁夜夜躁| 亚洲尤物在线| 免费约寂寞的女人网站| 激情玖玖sh| 97五月久久丁香婷婷| 色播播之激情五月婷婷| 永久免费一区二区三区| 丁香婷婷老熟女综合网| 99久视频| 日本五月天婷婷丁香| 可以直接看的AV| WWW久久99久久99久久| 亚洲久热| 99久久玖玖| av国产精品| 超碰a女人的天堂| 五月丁香六月情婷婷久久| 天堂色婷婷| 激情五月婷婷丁香综合网| 大香蕉久久伊人婷婷五月丁香| 天天色综网| 国外亚洲成AV人片在线观看| 激情婷婷久久| 婷婷五月花西瓜| 婷婷五月激情网| 激情九色| 就爱射中文字幕资源网| 六月婷婷五月天| 色玖玖玖| 婷婷五月天成人基地| 少妇激情五月天| 婷婷久久精品| 日韩精品无码99| 婷婷成人视频| 91色色色18| 色情五月天A片| 狠狠综合| 99riAv1国产在线观看| www.ppypp| 国产看真人毛片爱做A片| 久久总和99| WWW.桔色成人.COM| 五月婷丁香| 色女人久久| www,99热| 婷婷99视频全集高清| 五月六月播婷婷| 裸体做A爰片毛片A片免费| 9九九久久精品无码专区| 天天拍夜夜撸| 五月丁香久久网| 欧美、日韩、中文、制服、人妻| 欧美激情综合色综合色| 疯狂做受XXXX高潮A片| 99色综合| 干一干xxxx| 91xxxx九色| 五月丁香人人婷婷在线观看| 国产欧美精品AAAAAA片| 99综合网| 97干网站| www.五月天婷婷| 这里只有精品视频一区| 草草夜夜操| 成人五月天色天堂| av中文在线| 激情婷婷丁香五月天| 99网99热| 九九超碰人人| 人人爽亚洲| 久久性综合| 思思久久思思| 日日鲁鲁鲁夜夜爽爽狠狠视频97| 丁香五月激情婷婷视频| 色五月综合在线| 亚洲天99| 九九视屏| 97人人搞| 97极品在线| 久久精品63| 激情99| 东北黄色一级| 色婷婷的五月天| 天堂网色婷婷| 狠狠草狠狠草| 碰碰碰97免费精彩视频| 四色五月婷婷在线观看| 久久天堂女人| 99国产性感视频| 色狠狠婷婷| 久热a| 久久五月天激情| 国产美女精品| 黄色片久久| 五月天婷婷丁香视频| 国自产拍偷拍精品啪啪一区二区 | 天天操夜夜夜拍拍拍| 国产99久久久国产精品免费看| 五月丁香综合激情在线观看| 久久色天堂| 五月激情啪啪啪| 欧美久久婷婷| 嫩草AV久久伊人妇女超级A| 99热这里只有精品16| 伊人婷婷青青cao| 婷婷开心激情| 色播五月婷婷综合| 性av| 国产五月婷| av大香蕉| 。久久久久久久久久久久久久人妻| 婷婷激情六月中文| 骚货艹网站视频| 国产三级在线播放| 一本色道久久综合狠狠躁小说| 欧美VA视频| 色色色地址| 99色婷婷视频| 尔尔AV一区| 99er免费在线观看| 人操综合| 婷婷国产成人| 91要啪| 九九热AV| 丁香五月aV| www.99热国产| 五月婷婷AV| 日韩精品一区二区刘| 久久色亭亭五月天| AV在线资源| 97人人草| 亚洲五月天伊人| 伊人九九68| 美女天天爽| 久久激情五月婷婷| 久久激情网| 五月婷婷激情四月| 玖玖色资源| 六月丁香久久| 综合激情综合啪啪| 99久久終合| 欧美成人猛片AAAAAAA| 99综合网| 96自拍视频九色在线观看| 国产另类综合| 久久9999| 亚洲无码另类| 婷婷五月丁香基| 色综合播放| 亚洲成人超碰| 婷婷五月天直播| 123日本不卡在线| 五月婷婷在线观看黄| 在线另类| 欧美日韩成卜| 日本狠狠干| 色噜噜狠狠色综合日日| 九九热青草| 亚洲另类视频| 6月丁香婷婷| 五月丁小婷婷激情四射| 男人天堂网2017| a色色色色色| 99热爆在线| 日本色色网站| 婷婷丁香五月天综合网| 337久久| 色香久久| WWW五月天| 成人片在线免费看| 色色色免费视频| 99热日本| 99资源在线视频| 国产精品A成V人在线播放| 天天久久综合| 日本一级特黄大片AAAAA级| 丰满少妇猛烈A片免费看观看| 99er视频在线| 人人摸人人操人人爽| 狠狠综合| www,com,五月色色| er99免费视频在线| 99碰网站| 人人色人人弄人人操| 熟妇人妻中文字幕无码老熟妇 | 无码任你操| 丁香五月亚洲激情婷婷射| 激情九月丁香婷婷| 九九热99视频| 天天色综合综合| 丁香五月777| 天天干夜夜谢| 色亚洲激情| 久久婷婷热| 99久99久| 九九av| 欧美一级操逼视频| 日日天天天| 久热伊人在91| 五月天色不卡| 色色com| 婷婷五月综合欧美在线播放| 色婷六月| 九色综合网| 第四色激情网| 丁香五月天论坛| 成人必爱视| 婷婷99狠狠躁天天躁中文| 免费视频WWW在线观看网站| 欧美成人精品A片免费一区99| 影音先锋激情网| 操操操av| 欧美日比视频| 六月婷综合| 九九免费视频| 九九热最新视频| 欧美综合婷婷网| 婷婷五月丁香综合| 婷五月天| 另类小说五月天| 丁香婷婷色| 五月天涩涩| 五月天婷亚洲天综合网综合| 99热精品观看| 天天视频精品9| 熟妇内谢69XXXXXA片| 色九九九九| 色婷婷AV久久久久久久| 97激情五月天| 色5月婷婷| 色五月婷婷AV| 人妻视频一区而且二区| 无码人妻丰满熟妇奶水区码| 日本在线视频播放91| 激情综合色播| 五月社区婷婷激情| 超碰91在线| 伊人大香蕉在线视频| www.丁香六月婷婷久久天堂影院.con| 99热这里只有精品16| 久久婷婷亚洲| 久热网在线视频| 丁香五月天婷婷久久综合| 少妇高潮一区二区三区99欧美| 在线精品97| 国产精品久久久久久久久久| 五月丁香久久综合| 五月开心播播网| 99热在线这里| 欧美综合五月丁香六月婷| 欧美成人无码一区二区三区| 伊人久久五月天| 91久久久久久久91| 色综合77777| 国产AV一区二区三区日韩| 激情五月婷| 色五月五月婷婷| 思思国产99| 丁香婷婷伊人| 九九视频精品在线免费| 久久久久久天天日天天爱| 99热最新网址| wwwss在线观看| 日韩综合久久| 色天堂A| 啪精品| 色99超碰| 9色操| 91男同视频| 亚洲精品久久久久久久久久飞鱼| 99热伊人| 五月婷婷综合激情网| 夜夜爱伊人| 九色无码| 十月丁香九月婷婷综合| 人人操人av| 久久99久久99精品免观看软件 | 深爱婷婷网| 五月婷婷中文| 五月丁香啪啪综合| 婷婷五月天电影区小说区| 色99欧洲色19| 色五月首页| 丁香五月婷婷在线视频| 色综合综合色| 久久99成人性爱高清视频| 日韩精品色| 五月丁香六月婷婷在线播放| 第一区久久网站| 婷婷五月激情欧美大胆视频| 另类小说五月天综合网| 婷婷五月天人妻| 色五月天视频| 99综合一区| 日韩十国产极品久久| 天天日天天操天天干| 亚洲性图一区二区| 色偷偷狠狠| 天天操狠狠操| 51avj视频大全| 五月天啪啪| 丁香五月在线| 色五月婷婷老师| 久久AV无码乱码A片无码波多| 婷婷九月在线| 亚洲综合在线播放| www.91色| 噼里啪啦完整版中文在线观看| 999热在线视频| 五月天婷婷视频| 99热只有| 成熟妇人A片免费看网站| 国产偷人爽久久久久久老妇APP| 国产无套精品一区二区| 610018岁成人视频| 五月婷婷电影院| 丁香五月婷婷综合激情啪啪啪啪啪啪啪| 91碰碰碰久久久久| 亚州色综合| 9 1在线视频| 99热网址| AV九九| 色综久久久| 中文字幕婷婷五月天| 丁香五月视频在线观看| WWW.开心五月天.COM| 欧美日韩aaaa| 无码 色| 欧美色频| 国产熟女一区二区三区五月婷| 色五月天在线观看| 我要看激情五月天| 五月激情婷婷丁香| 五月天综合在线观看| 99热这里只有精品在线观看| www.日本91| 五月综合色| 天天在线XXX| 综合激情视频| 久久九九热视频| 啄木鸟丝袜美女福利视频| 色操b| 久久99久久99精品免观看软件 | 狠狠操天天操天天操| 5月色婷婷| 天天综合激情| 丁香六月啪| www.婷婷五月| 91精品久久久久久77777| 99热这里只有精品1025| 97人人做| www九九| 免费操超碰| 香蕉大综综综合久久| 97在线/日本| 大香蕉人人网| 激情五月婷婷丁香综合网| BlACKEDRAW视频一区二区| 97超级碰| 人妻免费网站| 成人AV网站在线| 久久婷婷资源| 99色精品| 97人人操| 日本久久天堂| 丁香五月激情宗合| 丁香婷婷免费| 五月丁香视频在线观看| 狠狠干总合| 精品怡红九九九| 天天情色综合网| 亚洲狠狠干| 最新丁香六月婷婷| 五月天综合网| 开心五月综合激情网| 超碰久热| 中文字幕丰满孑伦无码专区| 思思久久99热只有频精品66| 六月丁香网| www...com黄在线观看| 中文字幕欧美精品久久| 久久思思99| 婷婷五月综合网| wwwss在线观看| 成人视频九九| 99精品在线下载| 99精品视频网站| 婷婷四房播播| 九九激情网| 91丨九色丨大屁股| 五月婷婷涩涩爱| 丁香五月婷婷综合激情啪啪啪啪啪啪啪| 免费超碰在线| 久久婷狠狠色| 婷婷色五月婷婷姐妹| 天天综合色综合| 九九视频热| 橾逼网| 国产精品色婷婷99久久精品| 99久在线精品99re8热| 欧美日本免费一道免费视频| 果冻传媒A片一二三区| 五月婷婷综合色啪首页| 97干在线播放| 深爱五月激情网| 五月婷婷狠狠干| 囯产精品久久欠久久久久久九大| 丁香六月久久| 开心激情站| 黄色五月婷| 六月丁香久久| 另类小说婷婷色| 丁香五月天激情综合| 日本九九九九| 欧州婷婷五月天综合| 久久九九99桃花视频| 丁香五月婷婷激情小说| 亚洲小说欧美激情| 深爱激情五月天| 国产乱子轮XXX农村| 特黄三级又爽又粗又大| 91精品无码| 五月夜丁香| 中文av网| 99热精品免费| 五他月天啪啪啪| 色9999日韩国产| 九九热这里只有精品12| 麻豆国产精品色欲AV亚洲三区| 另类激情五月| 五月婷婷视频| 综合99久久天天综合| 狠狠干五月天婷婷网| 性色99| 亚洲成人高清在线| 天天干天天爽| 久re热视频| 婷婷丁香五月天色播网站| 五月婷婷基地| 婷婷六月丁| 韩国97天堂| 婷婷丁香色五月亚洲| 99日这里只有精品| 成人在线视频网| 欧美A A A A A| 九九九热精品| www.激情五月天| 操一区| 成人丁香婷婷| 亚洲成人网在线观看| 九九热手机在线视频| 久久精品99久久久久久| 色情终和网| 五月丁香久久综合| 亚洲国产va| 深爱开心激情| 97超碰欧美中文字幕| 99超在线| 91精品综合久久久久久五月丁香 | 激情婷婷亚洲五月| 色九月婷婷综合| 99网址在线观看| 五月天婷婷综合久久| 亚洲va在线∨a天堂va欧美va| 中文激情网| 久久久色情| 天天操天天日天天爱| 伊人五月综合网| 99热精品在线| 久久九九@| 97婷婷五月| 丰满少妇乱A片无码| 天天综合网~91综合网| 天天 青草 丝袜制服 在线| 激情综合区| 久久综合五月婷婷| 五月丁香天堂网婷婷| 色综合久久44| 五月丁香中文婷婷中文| 激情综合网络插| 久99久99精品免| 开心五月婷婷伊人| 夜夜涩涩涩| 五月天丁香成人社| 影音先锋 萱萱| 玖玖在线资源视频| 成人版视频在线观看| 丁香花五月天社区| 亚洲综合色丁香婷婷六月| 丁香六月婷婷综合| 中文字幕网站在线观看| 久久综合伊人综合在线| 91久久久久久| 91精品综合久久婷婷九色| 26uuu欧美日本| 中国无码av| 草操AV在线| www.99热视频| 99在线视频女女视频| 一本伊人色婷| 久草热8精品视频在线观看| 久99久视频| 婷婷五月情| 国产AV网页| 精品久久久久久久久久久久人妻| 日韩aaa| 99熟女视频| 六月丁香五月婷婷| 丁香婷婷综合色五月激情国产基地| 毛片新网地| 少妇人妻丰满做爰XXX| 99re66热这里只有精品| 久99在线视频| 丝袜熟女一区二区三区| 米奇激情婷婷| 国产精品第一国产精品| 九九热在线观看6| 亚洲综合草草| 最新色色五月天| 无码日本精品XXXXXXXXX| 91a片爽| 丁香婷停五月激情综合深爱| 免费无码毛片一区二区A片| 色吧五月婷婷| 免费无码又爽又刺激A片涩涩直播| 激情综合另类| 大伊久久| www.99视频| 色综合xx| 日本精品人妻无码77777| WWW,激情五月天,COM| 日韩AV片| 日韩综合天堂| 日韩色久| 丁香五月区| 五月天婷婷綜合院| www.99免费视频| AV人人操| 黄色91在线观看| 五月婷婷中文字幕| 久热99久热| 99视频在线观看网址| 综合久久综合综合| 五月婷亚洲精品| 中文字幕不卡视频| 五月丁香六月婷综合成人综合| 色色999三级片| 色欲天天综合| 丁香社92视频| 婷婷操婷婷干婷婷射| 丁香九色不卡aaa| 五月色天情| 欧美69色| 五月婷婷在线免费| 91九九精品| 六月丁香婷婷综合在线| 激情五月份婷婷| 色老汉电影| 久久九九99桃花视频| 色开心| 色婷婷丁香综合中文字幕| 丁香五月影视| 色月九九| 婷婷狠狠操| 婷婷的五月天另类视频| 天天干天天爽| 亚洲无码成人性爰网| 久久婷婷五月天丁香| 色丁香婷婷| www.五月婷| 丁香六月婷婷综合缴| 九热免费视频| 激情婷婷色色| 99 热| 免费观看全黄做爰的视频| 成人欧美Va| 99艹精品在线观看| 五月天六月色| 久久永久视频| 国产亚洲精品AAAA片APP| 可以直接看的av网站| 男女av免费看| 亚洲男女激情| 免费亚洲婷婷中文字幕| www.minyis.com【JT】实力收量可预付QQ2101460746 | 日韩精品成人在线| 五月天成人综合| 婷婷六月丁香激情| 国产成人精品亚洲线观看| 狠狠狠狠狠草| 激情五月婷婷她| 天天爽天天| a色色色色色| 五月天婷婷激情| 婷婷成人五月天成人文学小说| www亚洲无码| xxxx久| eeuus五月婷| 碰碰碰97国产| 激情婷婷六月天| 婷婷五月av| 亚洲12p| 婷婷五月激情视频| 黄色激情久久| www.色五月| 婷婷五月天亚洲激情戏精品| 五月天婷婷丁香人人操91| 综激情网| 亚洲熟妇AV综合网五月丁香伊人 | 婷婷五月天亚洲天堂| 潮汕成人AV片在线| 综合网啪| 婷婷五月天日逼| 日本99婷婷| 97碰啪啪| 亚洲性爱99在线| 97碰碰电影| 久久99热这里只有精品| 天天日天天做天天操| 五月天色色色网| 99性视频| 亚洲色欲AAAAAA| 99九九热视频| 九九色人| 亚洲人妻一区二区 | 性视频久久| 被强行糟蹋的女人A片| 99热这里只有精彩| 99热最新精品| 国产AV一区二区三区日韩| 丁香五月天论坛| 五月激情啪啪啪| 亚洲宗合激情| 久久免片| 影音先锋色色色资源色资源色| 国产AV影片| 在线观看av网站| 99热骚货| 丁香花操逼| 成人做爰高潮A片免费视频| www.婷婷五月天.com| 久鲁鲁色网| 99re在线免费视频| 人人摸人人摸| 看久久性爱99视频| 91色色色| 91色色色视频| 六月丁香五月天| 婷婷五月丁香手机在线视频| 成人精品在线观看| 91丁香婷婷综合久久欧美| 五月婷婷av| 色综合色综合网| 另类专区在线| 不卡成人免费| 婷婷五月丁香基地| 丁香六月色婷婷综合| 激情小说五月天社区丁香| 991自拍视频| 色色色热| 亚洲这里只有精品| 天天爽天天日人人爱| 日本色色网站| 激情婷婷| 伊人久久婷| 婷婷丁香五月亚洲免费| 大香蕉五月天婷婷| 九月激情婷婷丁香| 超碰人人色| 亚洲av骚货| 5月丁香六月情| 噜噜噜狠狠色综合| 亚洲第二AV| 中文幕无线码中文字蜜桃| 亚洲无码yw| 五月婷婷丁香色播网| 丁香色色色| 9999综合99综合人| 国产乱妇无乱码大黄AA片| 综合一区二区三区| 洗浴中心操B视频| 九九综合久久丁香婷婷,开心激情综合网| 密乳Va| 九 九九九AV| 国产毛多水多女人A片| 超碰免费99| 五月花综合视频| 五月色情婷婷| 黑人无码一区| 婷婷中合| 国自产拍偷拍精品啪啪一区二区| 五月婷婷激情日本| 蜜乳中文字| 色婷婷婷综合五月天| 成人视频一区| 激情五月份婷婷| 伊人激情网| 五月激情在线| 五月婷婷AV| pacopacomama 070722_670 素人奥様初撮りドキュメント 103 大久保純子 | 亚洲色热| 思思久日精品视频| 性小说五月天| www99热| 99精品久久久久久久| 国产女人十八水真多1| 中文字幕日产A片在线看| 久久99网| 97操视频| 一本大道道香蕉a| 五月天停停成人网| Xx色综合| 亚洲操逼网| 激情五月婷婷她| 91九九热| 丁香五月婷婷av影院| 亚洲五月天激情| 天天噜日日噜综合无码| 色婷婷五月天在线观看| 婷婷日日夜夜| 天天做天天爱天天综合| 色大综合| 欧美色骚婷婷五月天| 亚洲国产精品成人免费一区久久久在线观看AAAA | a免费在线| 久久精彩视频18| 婷婷色在线| 日韩aaaaa| 九九色99| 丁香激情网| 丁香婷婷深情五月亚洲| 亚洲国产色色| 色天天综合成人网| 操逼123网| 99热九九在线| 新激情五月开心五月婷婷五月丁香五月| 99亚洲综合| 色婷婷婷av |